Z -- Poplar Island Cell 6 and Cell 11 Dike Raisings

Notice Date
7/3/2024 8:45:29 AM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W2SD ENDIST BALTIMORE BALTIMORE MD 21201-2526 USA
 
ZIP Code
21201-2526
 
Solicitation Number
W912DR24B0006
 
Response Due
7/16/2024 8:00:00 AM
 
Archive Date
09/27/2024
 
Point of Contact
Gary Faykes, Phone: 4109620192, Aisha Boykin, Phone: 4109624978
 
E-Mail Address
GARY.FAYKES@USACE.ARMY.MIL, aisha.r.boykin@usace.army.mil
(GARY.FAYKES@USACE.ARMY.MIL, aisha.r.boykin@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
FY24 Poplar Island Cell 6 and Cell 11 Dike Raisings. The USACE Baltimore District has been tasked to solicit for and award a construction contract for the Poplar Island Cell 6 and Cell 11 Dike Raisings project. The proposed project will be a competitive, firm-fixed-price contract procured in accordance with FAR 14, Sealed Bidding, via an Invitation for Bid (IFB). Poplar Island is an ecosystem restoration project located in the upper-middle Chesapeake Bay in Talbot County, Maryland, approximately 39 miles south-southeast of the Port of Baltimore and two miles northwest of Tilghman Island. The overall scope of this project is to use approximately 300,000 cubic yards of stockpiled sand to raise two existing containment cell dikes on the island. The primary purpose of this contract is to raise the entire Cell 6 sand dike (approximately 14,000 linear feet) from an elevation of +25 feet to +30 feet. The work will be completed by manually hauling sand from an on-site sand stockpile located in an adjacent Cell 4. The secondary purpose of this contract is to use remaining sand in the Cell 4 stockpile to raise a portion of the Cell 11 sand bench (approximately 15,000 linear feet) by approximately three to five feet. All newly placed sand dike and bench sections will be shaped, compacted, and seeded with native grasses. Any remaining sand from the Cell 4 stockpile that is not used in the raisings will be hauled to another stockpile on the island, located approximately 1.8 miles north in Cell 1D. All work will be performed within Cells 4, 6, 1D, and 11 of Poplar Island, a remote location accessible only by boat. The Contractor shall provide all necessary labor, equipment, materials, and transportation to perform the construction. The anticipated period of performance is approximately 430 calendar days.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/22399bf53a2b4fa189927c8226a63a77/view)
 
Record
SN07117250-F 20240705/240703230113 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.