Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 10, 2024 SAM #8261
MODIFICATION

66 -- PMEL Workbenches

Notice Date
7/8/2024 1:15:59 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
337127 — Institutional Furniture Manufacturing
 
Contracting Office
FA4830 23 CONS CC MOODY AFB GA 31699-1700 USA
 
ZIP Code
31699-1700
 
Solicitation Number
FA483024Q0037
 
Response Due
7/31/2024 10:00:00 AM
 
Archive Date
09/01/2024
 
Point of Contact
Cloud Wharton, Phone: 2292574776, Samuel D. Garfunkel, Phone: 2292573947
 
E-Mail Address
cloud.wharton@us.af.mil, samuel.garfunkel.1@us.af.mil
(cloud.wharton@us.af.mil, samuel.garfunkel.1@us.af.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
�General Statement: This is a combined synopsis/solicitation for commercial items issued by the 23d Contracting Squadron, Moody AFB, Georgia. This announcement constitutes the only solicitation being issued for the requirement described herein. The 23d Maintenance Squadron (MXS) requires multiple size workbenches and roll around equipment stands to the specified requirements listed below along with their installation. All workbenches and roll around equipment stands shall be of a design that prevents accumulation of dust and facilitates cleaning. Working surfaces shall be resistant to heat, chemicals, chipping, or other deterioration and electrically nonconductive. � Vendor shall be required to provide all necessary equipment, tools, and materials needed to build (if not previously built) and place all workbenches and roll around equipment stands. All items must be fully assembled when placed in final position within the lab. Vendor shall perform function check of each workbench and roll around equipment stand. Vendor shall disassemble and remove old workbenches and roll around carts identified to be removed and place them in the parking lot outside Building 552, at location appointed by customer. Vendor shall complete work in three (3) rooms within building 552. Vendor shall be responsible for daily clean up and proper disposal of refuse and materials. Vendor shall be working in an environmentally controlled laboratory and must work in a fashion to maintain the environment to include but not limited to keeping the doors closed. Vendor shall limit bringing dirt into the lab and shall not be allowed to bring drinks into the lab. All workbenches must be built to requirements found inside Statement of Work. �3.1 � �Produce six (6) each electrical workbench with riser and top shelf. 72in �2 length, with an adjustable height, on demand, of 29in to 40in. Two (2) side by side and centered drawers. � 3.2 � �Produce three (3) each electrical workbench with riser. 72in �2 length. A five (5) drawer cabinet placed below the workbench from underside of bench to the floor, shall be placed on the right side. � 3.3a �Produce one (1) each electrical workbench with riser. 90in �6 length. A five (5) drawer cabinet placed below the workbench from underside of bench to the floor, shall be placed on the right side. � 3.3b �Produce four (4) each electrical workbench with riser. 90in �6 length. A five (5) drawer cabinet placed below the workbench from underside of bench to the floor, shall be placed on the left side. � �3.4 � �Produce seven (7) each electrical workbench. 72in �2 length. With an adjustable height, on demand, of 29in to 40in. Two (2) side by side and centered drawers. � �3.5 � �Produce four (4) each electrical workbench. 90in �2 length. with an adjustable height, on demand, of 29in to 40in. Two (2) side by side and centered drawers. � �3.6 � �Produce two (2) each butcher block workbench. 72in �2 length. A five (5) drawer cabinet placed below the workbench from underside of bench to the floor, shall be placed on the right side.� � 3.7 � �Produce one (1) each butcher block workbench. 90in �6 length. A five (5) drawer cabinet placed below the workbench from underside of bench to the floor, shall be placed on the left side. � 3.8 � �Produce two (2) each electrical split top workbench. Two (2) flush side by side tops a minimum of 36in �2 length. Top should rise independently, on demand, a minimum of 18in height. A five (5) drawer cabinet placed below the workbench from underside of bench to the floor, shall be placed on the left side. � 3.9 � �Produce sixteen (16) each roll around equipment stand. Flat with no fore and aft lip. 21in �1 length by 24in �1 width by 30in height with the workbench shelf adjustable to 33-degree pitch up facing forward. Two (2) each adjustable securing straps. One (1) or two (2) drawers would be acceptable. Four (4) each omni-directional wheel casters with lockable brakes. A site visit will be conducted on Wednesday, July 24th at 1:00 PM EST at Building 552 on Moody AFB. Respondents interested in the site visit shall respond no later than Tuesday, July 23rd at 10:00 AM EST to SrA Cloud I. Wharton at cloud.wharton@us.af.mil. All vendors must provide a capability statement with item specifications and measurements included for technical review.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/e48104a2c38f44e8b48fa058a0553fd1/view)
 
Place of Performance
Address: Moody AFB, GA 31699, USA
Zip Code: 31699
Country: USA
 
Record
SN07119382-F 20240710/240708230109 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.