Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 10, 2024 SAM #8261
SOLICITATION NOTICE

Z -- Prep and Paint Heritage Park Flagpole and Base

Notice Date
7/8/2024 8:29:24 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238320 — Painting and Wall Covering Contractors
 
Contracting Office
FA4460 19 CONS PKA LITTLE ROCK AFB AR 72099-4971 USA
 
ZIP Code
72099-4971
 
Solicitation Number
FA4460_PAINT_HERITAGE_PARK-Prep_and_Paint_Heritage_Park_Flagpole_and_Base
 
Response Due
7/17/2024 2:00:00 PM
 
Archive Date
08/01/2024
 
Point of Contact
Arrunh Boeger, Phone: 5019873844, Shawn Dostie, Phone: 5019877153
 
E-Mail Address
arrunh.boeger.1@us.af.mil, Shawn.dostie@us.af.mil
(arrunh.boeger.1@us.af.mil, Shawn.dostie@us.af.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The contractor shall provide all qualified personnel, transportation, tools, equipment, materials and services required to prep and repaint Heritage Park flag pole and concrete base on Little Rock AFB, AR 72099. �The contractor shall accomplish all services below to meet the requirements of this Performance Work Statement (PWS). �Work shall be in compliance with all Federal, State and local regulations, codes and license requirements. �Work shall be accomplished within 30 days of material arrival. �Estimated delivery date of material is required to be sent to the Contracting Officer Representative (COR) within 15 days of contract award. Work shall be completed within 90 day of award. The contractor shall perform full prep of the metal flag pole and the concrete base surrounding the pole. �Prep includes sanding or sand blasting the pole to eliminate any rough areas or chipped areas. �Concrete base area is 43 feet 6 inches in diameter, prep includes sealing or repairing any cracks in the concrete. �Primer any exposed bare metal or concrete or chipped area so paint will adhere. �Paint flag pole a gloss white and the truck at the top a golden color. �Protect any exposed cables or pulleys from being over sprayed. Concrete base paint is red on the center 8 feet in diameter, white star on the next section our and blue field on the outside of the circle. �Follow the existing layout pattern. �Paint and primer used must the type to adhere to the material being painted (metal or concrete). �SDS's will be provided on all materials used in the process prior to start of the work. �Clean up of the work area and disposal of all waste is the responsibility of the contractor. �Equipment rental such as lifts, or painting equipment and all material used in the project are the responsibility of the contractor to provide. (Appendix A) Contractor shall furnish and replace the protective halyard stoppers to protect the paint on the pole from chipping during high winds. (Appendix B) Site Visit: An organized site visit is scheduled for 12 July 2024 at 10:00 AM CST. This will be the only site visit conducted. Participants are to meet at the front gate visitor center of Little Rock AFB @ 9:30 AM to allow time to obtain escort passes and accountability. Vendors MUST RSVP to the POCs listed no later than 11 July 2024 at 4:00 PM CST on who will be attending the site visits. Little Rock AFB is not an open base and you must have a valid ID to access the base.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/6d9ae1f0a70f40798271341004bb14cf/view)
 
Place of Performance
Address: Little Rock AFB, AR 72099, USA
Zip Code: 72099
Country: USA
 
Record
SN07119873-F 20240710/240708230113 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.