SOLICITATION NOTICE
59 -- 59--WY Air Circuit Breaker SH PP 52A Spare
- Notice Date
- 7/8/2024 11:18:13 AM
- Notice Type
- Presolicitation
- NAICS
- 335313
— Switchgear and Switchboard Apparatus Manufacturing
- Contracting Office
- GREAT PLAINS REGIONAL OFFICE BILLINGS MT 59101 USA
- ZIP Code
- 59101
- Solicitation Number
- 140R6024Q0086
- Response Due
- 7/15/2024 9:00:00 AM
- Archive Date
- 07/30/2024
- Point of Contact
- Zook, Chris
- E-Mail Address
-
czook@usbr.gov
(czook@usbr.gov)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- The Bureau of Reclamation, Missouri Basin Region, intends to issue a Commercial Request for Quote (RFQ) for the following Brand Name supplies: a. Standard Equipment i. Reconditioned, ABB, Model MB-8 Electrically Operated Draw Out Circuit Breaker with Stored Energy Operator 1. Reconditioned is defined as: Cleaned, Adjusted, Properly Lubricated, Free of Defects, Fully Operational, with No Observable Deficiencies. All contact surfaces should be polished and all moving parts should move freely. ii. Factory New, ABB, Control Device Assembly, 125 VDC for KLine/ MB/VHK Circuit Breaker, Part No. 708392-T07, Installed In Breaker with standard wiring configuration. iii. Factory New, ABB, Shunt Trip Assembly, 125 VDC for K-Line/MB/VHK Circuit Breaker, Part No. 708393-T07, Installed In Breaker with standard wiring configuration. iv. Factory New, Utility Relay Company, AC-Pro II Kit, Part No. AC2M-MBE-8 Includes Mechanical Auto-Reset Actuator and 8000/400A CTs. Installed in Breaker with standard wiring configuration. b. Additional Requirements i. The fully assembled reconditioned air circuit breaker with installed Control Device Assembly, Shunt Trip Assembly, and AC Pro II Kit shall be accompanied by a standardized test report demonstrating acceptable results as outlined in ABB MB-8 Breaker Maintenance Instructions and NETA MTS-2019 (Maintenance and Testing Standards). ii. Electrical Test to be Documented. 1. Primary Injection Current-Time Test Results � Long-Time Pickup. � Long-Time Delay. � Short-Time Pickup. � Short-Time Delay. � Instantaneous Pickup. � Instantaneous Delay. 2. Insulation Integrity Test Open-Closed. 3. Main Contact Resistance Measurements. 4. Arcing Contact Gap Measurements. 5. Main Contact Dielectric Test. 6. CT Polarity Test. 7. CT Resistance Test. iii. Visual and Functional Inspections to be Documented. 1. Frame. 2. Primary Disconnects. 3. Secondary Disconnects. 4. Arc Chutes. 5. Main Contacts. 6. Arcing Contacts. 7. Interlocks. 8. Contact Alignment. 9. Mechanism Operation. 10. Phase Barriers. 11. Contact Wipe. 12. Actuator Trip-Free. The delivery location is: Bureau of Reclamation, located at 4 Reclamation Road, Cody, WY 82414. FOB Destination of all supplies with an anticipated delivery date of September 30, 2024. It is anticipated the simplified acquisition set aside will be a Total Small Business with Tradeoff evaluation criteria. It is intended the Request for Quote (RFQ) will be posted on or about 15 July 2024 via the SAM.gov website. It is incumbent upon contractors to monitor the SAM.gov web page for RFQ release and all subsequent amendments. The product service code is 5925 and the NAICS code is 335313. HARD COPIES OF THE SOLICITATION WILL NOT BE ISSUED. Quotations are not requested and will not be accepted from this Pre-Solicitation Notice. It is required all companies are to be actively registered in SAM.gov prior to submitting a quotation for this solicitation. For further information or questions regarding this solicitation, please contact Chris Zook by e-mail at czook@usbr.gov.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/e336c90d03f14065b3fb325d23aaa5e3/view)
- Record
- SN07120116-F 20240710/240708230115 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |