Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 13, 2024 SAM #8264
SOLICITATION NOTICE

Y -- CA ERFO NP DEVA 2023-3(2) Repairs and Armoring

Notice Date
7/11/2024 11:49:23 AM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF24B000010
 
Response Due
8/1/2024 1:00:00 PM
 
Archive Date
08/16/2024
 
Point of Contact
Laura Vallejos, Leslie Karsten
 
E-Mail Address
CFLContracts@dot.gov, CFLContracts@dot.gov
(CFLContracts@dot.gov, CFLContracts@dot.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
PROJECT NUMBER: CA ERFO NP DEVA 2023 � 3(2) PROJECT NAME: REPAIRS AND ARMORING PROJECT DESCRIPTION: The project is located in Death Valley National Park in Inyo County. Death Valley National Park sustained significant roadway damage park wide due to historic rainfall from Hurricane Hillary. The base schedule consists of pavement patching and armoring on multiple routes, removing and replacing asphalt on harmony borax trail, and roadway reconditioning and placing new culverts on West Side Road. Option X consists of pavement patching and armoring on Emigrant Canyon Road from MP 0.0 to MP 8.0. SCOPE OF THE WORK: This project consists of pavement patching, roadway reconditioning, armoring, sign installation and replacement, and installing new gates on multiple routes throughout the park. Armoring consists of paved shoulders, gabion walls, revet mattresses and a combination of revet mattresses with concrete barrier. The desert tortoise is present along some routes at elevations higher than 2,000 feet. Biological and Archeological monitors will be required for the duration of the project. The contractor will be allowed to set up stand tanks at three locations within the park to collect water. There are limitations to the quantity of water that can be pulled from each source per day. SIGNIFICANT QUANTITIES: Significant items include (quantities are subject to change): Schedule A Removal of Pavement, Asphalt � 2,200 SQYD Revet Mattress, Galvanized or Aluminized Coated � 2,500 SQYD Roadway Reconditioning � 3 Mile Asphalt Concrete Pavement Patch, Type 1 � 7,700 SQYD 24-Inch Pipe Culvert � 100 LNFT Sidewalk, Asphalt � 2,100 LNFT Concrete Barrier � 2,800 LNFT � Option X Gabions, Galvanized or Aluminized Coated � 3,500 CUYD Revet Mattress, Galvanized or Aluminized Coated � 650 SQYD Contractor Furnished Gabion Wall Design - LPSM Asphalt Concrete Pavement Patch, Type 1 � 4,500 SQYD Concrete Barrier � 550 LNFT ANTICIPATED SCHEDULE: Advertise: July 2024; Award: August 2024; Construction: August 2024 through February 2025. The estimated bid range is between $10,000,000 and $20,000,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/5b734ea8cc9f4862b8a2b1bdbf590ef2/view)
 
Place of Performance
Address: Death Valley, CA, USA
Country: USA
 
Record
SN07124700-F 20240713/240711230115 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.