SOLICITATION NOTICE
Z -- Assembly of Shelving Racks
- Notice Date
- 7/11/2024 11:05:52 AM
- Notice Type
- Solicitation
- NAICS
- 238390
— Other Building Finishing Contractors
- Contracting Office
- DCSO-P NEW CUMBERLAND NEW CUMBERLAND PA 17070-5059 USA
- ZIP Code
- 17070-5059
- Solicitation Number
- SP7000-24-Q-0014
- Response Due
- 7/18/2024 12:00:00 PM
- Archive Date
- 08/02/2024
- Point of Contact
- David Purvis
- E-Mail Address
-
David.1.purvis@dla.mil
(David.1.purvis@dla.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- Defense Logistics Agency (DLA) Data ProductionsOperations seeks to procure services to remove and install a new racking system: - One time requirement that must be completed in 30 days after award. - Remove 54 cross beams and stacking for later use. - Remove 10 uprights in the warehouse and stack on provided pallet outside. - Install 10 new uprights following all manufacturer guidelines within the same footprint of the old uprights. - Install 72 cross beams mirroring the new setup that has already been established in row l of the warehouse. - Install wire decking (shelving) on bottom 2 rows (36 total). Amendment 00001: The closing date of SP7000-24-Q-0014 is extended to 24 June 2024 at 14:00. What is the height of the uprights? 25 ft (H) x 4 ft (D) What is the length of the beams? 9 ft Is a scissor lift needed? Yes, scissor lift would be recommended. Is a forklift needed? Yes Will ladders be sufficient for installation? Scissor lift would be recommended due to the height of the racks. Do ladders, forklifts, and scissor lift need to be provided or are they on site to be used? They will need to be provided. What size are the old uprights? 25 ft (H) x 3 � ft (D) What size are the old beams? 9 ft What size are the new uprights? 25 ft (H) x 4 ft (D) How many shelf levels is each bay? 4 How much weight does each shelf level need to hold? 1200 LBS Can you provide picture or layout of old system? See attached Can you provide picture or layout of new system? The new layout will mirror the previous layout. Does the offeror need to include procurement of new racking materials, or will it be provided? The new racking material has been purchased and is on-site (minus bolts for uprights to floor). Are there drawings and pictures of the work area available? See attached. What does the area look like? See attached. Are site visits available? Yes, we can schedule a site visit M-F from 0700 to 1400 CST. What size cross beams and uprights are required to be demolished? Uprights are 25 ft (H) x 3 � ft (D) and cross beams are 9 ft wide. What size uprights, cross beams, and wire decking are being installed? Uprights to be installed are 25 ft (H) x 4 ft (D). Same cross beams need to be installed. Will equipment be needed to demo and install? Yes What material is being installed and demolished? DLA material is to be taken down and installed. What are the manufacturer�s guidelines for installation? Uprights and cross beams have been purchased through� � � Granger and Uline. The uprights were manufactured by Husky Rack and Wire. Amendment 0002: Add Department of Labor Wage Determinations. Since this is a service contract above $2,500.00 wage determination is required.�
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/095182209dc14bb19d02c1a3dfbf56fd/view)
- Place of Performance
- Address: Altus AFB, OK 73145, USA
- Zip Code: 73145
- Country: USA
- Zip Code: 73145
- Record
- SN07124780-F 20240713/240711230115 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |