Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 17, 2024 SAM #8268
SOLICITATION NOTICE

Z -- BRADFORD ISLAND SERVICE BUILDING PRQ SWITCHGEAR UPGRADE

Notice Date
7/15/2024 5:54:12 AM
 
Notice Type
Solicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
W071 ENDIST PORTLAND PORTLAND OR 97204-3495 USA
 
ZIP Code
97204-3495
 
Solicitation Number
W9127N24R0012
 
Response Due
7/24/2024 11:00:00 AM
 
Archive Date
08/08/2024
 
Point of Contact
Andrew Sprys, Michael Saldana, Phone: 5038084608
 
E-Mail Address
andrew.j.sprys@usace.army.mil, Michael.E.Saldana@usace.army.mil
(andrew.j.sprys@usace.army.mil, Michael.E.Saldana@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
03-JUL-24:�The purpose of this Amendment is to extend the solicitation due date to 11:00 A.M. on 24-JUL-2024. See Summary of Changes. All other terms and conditions remain unchanged. 27-JUN-24:�The purpose of this Amendment is to add Reference Drawings that were inadvertently left out of the solicitation package. See Summary of Changes. All other terms and conditions remain unchanged. 25-JUN-24:�The purpose of this Amendment is to update the Bidder Inquiry key. See Summary of Changes. All other terms and conditions remain unchanged. Project Background. The Bradford Island PRQ Substation is supplied by two underground 13.8kV medium voltage feeders from an intertie in the High Voltage Cable Vault 11 (HVCV11) located in the South Spillway Tower. The intertie feeders are connected to the power sources from both Powerhouse 1 and Powerhouse 2 for redundancy and each of the two PRQ feeders are tapped off the intertie using 600A dead break elbow junctions in the HVCV11. From the South Spillway Tower HVCV11, the two PRQ feeders go through an underground duct bank to the Bradford Island Service Building electrical room where PRQ Substation resides. The Bradford Island Service Building electrical room measures 22 feet by 24 feet housing two disconnect switch cabinets, two 1000kVA 3?phase 13.8kV to 480V transformers and the switchgear cabinet sections. The electrical room housing the equipment is operating in a non?controlled environment with higher temperature and humidity than industry standards. Present day switchgear and associated equipment have sensitive electronic equipment, which requires a specific operating temperature threshold to function accurately. The electrical room is currently cooled by two powered exhaust units located in the attic space where outside air is supplied through fans and filtered louvers located in the exterior doors. The fans are controlled by a thermostat inside the electrical room. The PRQ Substation supplies power to the pump house fire system, the shelter building equipment and five other 480V panelboards within the Bradford Island Service Building. The equipment using the supplied power are 120V and 480V receptacles, lighting panelboards, various saws and grinders, various cranes, fans and heaters, and other numerous daily computing, telecommunication, and maintenance equipment requiring power to support the engineering and service departments. The objective of this project is to replace the existing PRQ Substation with new 1500kVA transformers, 8 section switchgear and associated electrical protection equipment. This will entail relocating the transformers and associated electrical protection equipment to the parking lot area right outside of the existing electrical room. Completion of this work will meet the criteria and constraints as defined in the Phase 1A Report. Project Scope. The following information represents the project objectives: 1. Replace the existing 480V switchboard and station service transformers located in the Bradford Island Service Building. 2. Relocate the new transformer disconnect switches and (2) 1,500 kVA transformers directly outside the existing electrical room. 3. The new 480V switchgear and associated equipment will be housed in the existing electrical room. 4. Provide an exhaust fan or AC system to provide cooling for the electrical room. 5. Provide panic hardware for existing electrical room doors, fire stopping for all conduit penetrations through rated walls, fire extinguishers, and emergency lighting as required for life safety code compliance.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/7fbb670009224684b8409ea288601316/view)
 
Place of Performance
Address: Cascade Locks, OR 97014, USA
Zip Code: 97014
Country: USA
 
Record
SN07128453-F 20240717/240715230109 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.