Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 19, 2024 SAM #8270
SOLICITATION NOTICE

Z -- Lock & Dam 2 Barge Impact Repair

Notice Date
7/17/2024 11:46:43 AM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W07V ENDIST ST PAUL SAINT PAUL MN 55101-1323 USA
 
ZIP Code
55101-1323
 
Solicitation Number
W912ES24B0012
 
Response Due
8/9/2024 11:00:00 AM
 
Archive Date
09/30/2024
 
Point of Contact
John P Riederer, Phone: 6512905614, Kenneth J. Eshom
 
E-Mail Address
John.P.Riederer@usace.army.mil, kenneth.j.eshom@usace.army.mil
(John.P.Riederer@usace.army.mil, kenneth.j.eshom@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The U.S. Army Corps of Engineers - St. Paul District is seeking a Contractor for a firm-fixed price Construction contract to repair damage to the upstream guidewall of Lock & Dam 2 in Hastings, MN.�� In late October 2023, twelve barges connected to a pushboat, with a combined weight of around 40,000 tons, collided with Lock & Dam 2 Upstream Guidewall Monolith 25 (LD2 UG25). The upper portion of the monolith sheared from the base, below the waterline, at the site of repairs to a similar incident in 2011. The upper guidewall is approximately 44 inches askew, and the foundation is 17 inches out of place. The 2011 repair design performed as intended, preventing further damage to other guidewall monoliths or the base of the structure. Temporary repairs, to stabilize the upper guidewall by securing a large metal beam along the top portions of UG24 and UG25, were completed in April 2024.� This construction contract will require the demolition and removal of the upper portion of the upstream guidewall monolith 25, and realignment of the foundation of monolith 25 and minor adjustment of monolith 24. The principal repair feature is replacing approximately 180 CY of cast-in-place reinforced concrete, portions of which are below water. The contractor will need to engineer, furnish, operate and remove the associated dewatering system (e.g. cofferdam).� The work will be executed in a compressed timeframe under adverse environmental conditions (i.e. Minnesota winter). Construction cannot begin until after the navigation season has ended (lock closure is tentatively scheduled for December 9, 2024) and must be complete by early March 2025.� This project is solicited in accordance with FAR part 14 - Sealed Bidding procedures with the intention of awarding a single firm-fixed price construction contract.� The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000.� This Invitation for Bid (IFB) is 100% set-aside for Small Businesses.� The NAICS for this procurement is 237990, Other Heavy and Civil Engineering Construction. The SBA Size Standard for this NAICS is� $45,000,000. The PSC for this procurement is Z2KA, Repair or Alteration of Dams.� The location for this project is:� Lock and Dam No. 2� 1350 Lock and Dam Road� Hastings, MN 55033-1145� The project site is located in Dakota County, Minnesota.� Lock & Dam 2 is located at Upper Mississippi River Mile (UMRM) 815.2 AMENDMENT 0001 has been posted�7/17/2024 - This amendment makes changes to clause 52.236-4 and Section 01 14 00.00 13 of the solicitation specifications.�
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/a038a6667d37445abacb8db00e4694c4/view)
 
Place of Performance
Address: Hastings, MN 55033, USA
Zip Code: 55033
Country: USA
 
Record
SN07131884-F 20240719/240717230119 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.