SOLICITATION NOTICE
F -- Rivbulio Fire Recovery IRSC
- Notice Date
- 7/22/2024 4:17:41 PM
- Notice Type
- Presolicitation
- NAICS
- 115310
— Support Activities for Forestry
- Contracting Office
- USDA-FS, STEWARDSHIP CONTRACTING BRANCH Washington DC 202501138 USA
- ZIP Code
- 202501138
- Solicitation Number
- 12363N24R4018
- Archive Date
- 08/30/2024
- Point of Contact
- Matt Daigle, Stewardship Acquisition Program Support Officer, Phone: 6054159057
- E-Mail Address
-
matthew.daigle@usda.gov
(matthew.daigle@usda.gov)
- Description
- Rivbulio Fire Recovery IRSC � PPS-NPO Stewardship Contracting Branch 12363N24R4018 Mount Hood National Forest, Clackamas River Ranger District Presolicitation Notice Classification Original Set Aside: NONE Product Service Code:�F099 - NATURAL RESOURCES/CONSERVATION- OTHER NAICS Code:�115310 - Support Activities for Forestry Place of Performance: Sandy, Oregon 97055 Background: The Mount Hood National Forest is preparing the Rivbulio Fire Recovery IRSC which shall be awarded under the following Stewardship Authority: Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014�Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999. Stewardship authority grants the Forest Service the authority to aggregate stewardship work activity requirements and solicit those requirements utilizing full and open competition. NAICS: 115310: Support Services for Forestry, Size Standard: $34M Fuels Management Services. Multiple awards may be made when the contract is solicited. Project areas have been separated and the schedule is designed to allow for individual awards to be made that will complete all requirements within a given project area. ***Draft versions of the contract are being made available to contractors to get familiar with the requirements. These are not the FINAL contract requirements and information contained in these documents is subject to change.� Final quotes should not be developed nor submitted based on the draft information. *** Project Location: The Rivbulio Fire Recovery IRSC project is located approximately 16 miles (Memaloose) to 56 miles (Olallie) southeast of Estacada, Oregon. Access to the project area is via State Highway 224 (heading southeast from Estacada) and Forest Road 46; using Forest Service Roads (FSRs) within the Memaloose/Hillockburn, Fish Creek, Bull Complex, and Olallie areas south of State Hwy 224. The total project area is within the Clackamas Ranger District of the Mt. Hood National Forest. The proposed project area lies generally within the following township and ranges and FSRs: Memaloose/Hillockburn Area � T04S, R05E and T05S, R05E; FSR 4500, 4500220, 4500240, 4510, 4520, 4510021 Fish Creek Area � T05S, R05E and T05S, R06E; FSR 5400, 5410, 5411, 5412, 5411210 Bill Complex Area � T08S, R07E; FSR 6350, 6355, 4671, 4672 Olallie Area - T08S, R08E and T09S, R08E; FSR 4220 Willamette Principal Meridian, Clackamas County, Oregon. � Planned Period of Performance: All work is tentatively anticipated to have the following final completion dates: December 31, 2027. Description of Work: The Rivbulio IRSC will implement roadside hazard tree abatement treatments, road repair and reconstruction work in response to disaster declaration FEMA-4562-DR. The objective is to reduce roadside fuel loading and to provide safe access for the public road users. Activities to achieve these end results include performing essential maintenance and reconstruction of roads, cutting of fire killed/damaged roadside trees, removal of cut timber, managing roadside slash and fuel accumulation which will help with site preparation for future reforestation efforts along roads and reduce future fire risk. This contract will secure services to perform necessary hazard tree abatement work along Forest system roads that will include the removal of Forest products that meet utilization standards and associated slash work, Additional services to be procured include standard road maintenance activities, culvert cleaning and replacement, guardrail replacement, and armoring of identified system roads to facilitate the removal of Forest products. The anticipated operational seasons for road work activities is June 1 � October 15 annually. Ground based hazard tree work is anticipated to be permitted year-round and must comply with required protections for wet season operations and IFPL. The end result is a road system that has no standing fire killed/damaged trees within striking distance of the road (including the slide and roll area). This will be done by accomplishing the following: Identifying and cutting standing fire killed/damaged trees. Removing cut trees where applicable. Piling, scattering, chipping, incinerating and/or removing operationally generated slash and fuels. Maintaining roads within the contract area. Reconstructing roads within the contract area. Estimated Timber Volume and acres is as follows: The entire project area is estimated at 2,314 acres of roadside hazard tree abatement with associated slash treatments in removal areas. Forest Product volume estimates for the entire project are 48,901 CCF of biomass/cull material. Volume quantities are made available with the understanding that values shown are Forest Service estimates and are not guaranteed. Interested Contractors are urged to examine the individual contract areas and make their own estimates. The Hillockburn-Memaloose project area is estimated at 866 acres and 25,394 CCF of biomass/cull. The Fish Creek project area is estimated at 627 acres and 15,872 CCF of biomass/cull. The Bull Complex project area is estimated at 383 acres and 7,953 CCF of biomass/cull. The Olallie Lake project area is estimated at 438 acres and 5,682 CCF of biomass/cull. Pre-Solicitation Site Visit Date and Time: Prior to solicitation, the Forest will hold a site visit for prospective contractors to discuss the end results of the project, and to facilitate dialogue on contractual requirements that are anticipated in the contract, and any discuss or consider any operational limitations foreseen by attendees. The site visit will be held on August 6th, 2024, at 10:00 a.m. PT with a meeting location at the Fish Creek Campground, at the junction of OR 224 and Forest Service Road 54. Included Attachments: 0. Rivbulio Fire Recovery IRSC Presolicitation Letter 1. 12363N24R4018 Rivbulio FR IRSC_DRAFT 2. Rivbulio FR IRSC Appendix A_DRAFT 3. Rivbulio FR IRSC Appendix B_DRAFT 4a. Hillockburn/Memaloose Appendix C_DRAFT 4b. Fish Creek Appendix C_DRAFT 4c. Bull Complex Appendix C_DRAFT 4d. Olallie Appendix C_DRAFT 5a. Hillockburn/Memaloose Appendix D Plans_DRAFT 5b. Hillockburn/Memaloose Appendix D Supplemental Specifications_DRAFT 5c. Fish Creek Appendix D Plans_DRAFT 5d. Fisk Creek Appendix D Supplemental Specifications_DRAFT 5e. Bull Complex Appendix D Plans_DRAFT 5f. Bull Complex Appendix D Supplemental Specifications_DRAFT 5g. Olallie Appendix D Plans_DRAFT 5h. Olallie Appendix D Supplemental Specifications_DRAFT 6a. Hillockburn-Memaloose CAM_DRAFT 6b. Fish Creek CAM_DRAFT 6c. Bull Complex CAM_DRAFT **Will be uploaded at a later date** 6d. Olallie CAM_DRAFT 6e. Olallie Slash CAM_DRAFT 6f. Rivbulio IRSC Invasives Map Book_DRAFT 6g. Rivbulio IRSC Invasives North Tiles_DRAFT 6h. Rivbulio IRSC Invasives South Tiles_DRAFT 7. Sediment Trap Examples Service Contract Act and Construction (Davis Bacon) Wage Determinations will be provided when the Rivbulio Fire Recovery IRSC is solicited. It is anticipated that the Request for Proposals with all attachments shall be issued the week of August 5th, 2024. The contract shall be awarded using a best value source selection method; the resulting contract shall be a firm fixed price commercial services contract. The estimated price magnitude for road reconstruction work requirements in all project areas requires that bid guarantees be provided with proposals, and that payment and performance bonds be provided within 10 days of an award. Bonding requirements apply only to road construction work items and are not applicable to work items 1 and 2, nor road maintenance work items. Please direct questions in writing to: Matt Daigle, Senior Acquisition Program Support Officer, matthew.daigle@usda.gov
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/90ea112225824e679d3feb8e34a2979b/view)
- Place of Performance
- Address: Sandy, OR 97055, USA
- Zip Code: 97055
- Country: USA
- Zip Code: 97055
- Record
- SN07137494-F 20240724/240722230113 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |