SAMDAILY.US - ISSUE OF JULY 25, 2024 SAM #8276
SOLICITATION NOTICE

J -- CGC MUNRO LOAD BANK

Notice Date
7/23/2024 1:16:46 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
336611 — Ship Building and Repairing
 
Contracting Office
SFLC PROCUREMENT BRANCH 2(00085) ALAMEDA CA 94501 USA
 
ZIP Code
94501
 
Solicitation Number
70Z08524P06620
 
Response Due
8/7/2024 8:00:00 AM
 
Archive Date
08/07/2024
 
Point of Contact
BRENDEN COX, Phone: 12068315347, KYLER FISK, Phone: 9492881271
 
E-Mail Address
BRENDEN.S.COX@USCG.MIL, KYLER.C.FISK@USCG.MIL
(BRENDEN.S.COX@USCG.MIL, KYLER.C.FISK@USCG.MIL)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
This is a combined synopsis/solicitation for commercial items/services prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued. This Request for Quotations incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-65 dated January 29, 2013. The NAICS Code is 336611. The small business size standard is 1250. This is a total small business set aside. All responsible sources may submit proposals that will be considered by the agency. The contract will be awarded on a firm-fixed-price basis using simplified acquisition procedures in accordance with FAR Part 13.5. The United States Coast Guard Surface Force Logistics Center has a requirement for the following: The CTR shall provide:� 1.� SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to perform load testing of designated Ship Service Diesel Generator (i.e., SSDG) listed in Table 1. TABLE 1 � LIST OF SHIP SERVICE GENERATOR EQUIPMENT MANUFACTURER / MODEL NUMBER DESCRIPTION LOCATION / SWITCHBOARD SSDG No.1 Caterpillar 3512B 1360 kW, 450 VAC, 60 Hz, 3 phase, 1800 RPM, 0.8 power factor Auxiliary Machinery Room (5-36-1-E) SS Switchboard No.1 S 1.2 Government-furnished property. None. 2.� REFERENCES Coast Guard Drawings Coast Guard Drawing 418A-WMSL-100-001, Rev A, General Arrangements Coast Guard Drawing 750-WMSL-501-002, Rev E, Machinery Arrangements (ASC501001) Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2023, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2023, Requirements for Preservation of Ship Structures Coast Guard Technical Publication (TP) 7119, Ship Service Diesel Generators - Model 3512B Coast Guard Technical Publication (TP) 7165B, Ship Service Switchboards 1S, 2S, 3S & 1SP Shore Power � Operation, Maintenance & Installation � Volume 1 Coast Guard Technical Publication (TP) 7166B, Ship Service Switchboards 1S, 2S, 3S & 1SP Shore Power � Operation, Maintenance & Installation � Volume 2 & 4 Coast Guard Technical Publication (TP) 7167, Ship Service Switchboards 1S, 2S, 3S & 1SP Shore Power � Operation, Maintenance & Installation � Volume 3 Other References COMDTINST 9077.1 (series) Equipment Lockout-Tags-Plus Instruction MIL-STD-1310, Sep 2009, Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility and Safety 3.� REQUIREMENTS 3.1 General. 3.1.1 CIR. None. 3.1.2 Tech Rep. The Contractor must provide the services of a Qualified Technical Representative, who is familiar with the Caterpillar SSDG (Model No. 3512B) and National Oilwell Varco (i.e. Baylor Generator) to accomplish the following on site: Provide manufacturer's proprietary information, software, and tools pertinent to the equipment/system. Assist with proper repair methods, and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system. Ensure compliance with manufacturer's procedures and standards during coupling disassembly, inspection, reassembly and alignment of the SSDG(s). 3.1.2.1 Ensure the Tech Rep has a r�sum� of demonstrated experience with the system/equipment stated above.� 3.1.2.2 Submit the Tech Rep�s name and r�sum� to the COR at the Arrival Conference. 3.1.3 Protective measures.� The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). 3.1.4 Interferences.� The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following: Piping Electrical Cables Switchboard Vent Ducting Motor Operated Valves 3.1.5 Background information.� SSDG listed in Table 1 will be modified by the Coast Guard for the following task: Bearing Replace 3.1.5.1 After completion of above listed task by the Coast Guard, the intent of this Work Item is for the Contractor to perform a laser alignment, pinning, and load testing of designated SSDG listed in Table 1. 3.2 Work location.� The concerned work area is listed in Table 1.� See the applicable drawings in References in Paragraph 2 for guidance, locations, and details.� 3.3 Grounding.� The Contractor must bond and ground each cable in accordance with MIL STD-1310.� (Note: If the load bank is placed on the Pier, then its frame must be insulated from the concrete. If the load bank is mounted on the flatbed truck, the tires will accomplish the isolation. An equipment ground (#4/0 Awg) conductor must be run from the load bank to the ship hull.) 3.4 Contractor Furnished Materials (CFM).� The Contractor must furnish materials listed in the Table 2 for load testing of the SSDG listed in Table 1. The Contractor must provide all special tools required to perform work on this item. TABLE 2 � CONTRACTOR furnish MATERIALS MATERIALS description SOURCE OF SUPPLY Load Bank 1500 KW, 450 Volt AC, 3 Phase, 60 Hz, Resistive Electrical Equipment�s Rental Company Load Bank Cables Approximate length of 300 Feet Cables with ring tongue compression lugs (6 Paralleled #4/0 copper load bank conductors per phase (18 Total x 300 Feet) and one additional length for the equipment grounding conductor or Six LSTSGU-400, Two Cables at each Phase Tony Santiago Murray Benjamin Electric 397 West Ave. Stamford CT 06902 (203-705-2100) OR Any Electrical Cable Supplier 3.4.1 The contractor must provide miscellaneous hardware required for electrical installation (i.e. Nylon Stuffing Tubes, Box Connectors, Lugs, Fasteners, Wire Nuts, Tapes, Cable ties & Cable Mounting Brackets, etc) of the electrical equipment. WARNING Complete Red Danger Tags In ACCORDANCE with COMDTINST 9077.1 (series). 3.5 Operational test, initial.� Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. 3.6 Initial shaft alignment. �The Contractor must measure the existing Generator shaft to Engine shaft alignment using the two dial indicator method or Laser Shaft Alignment as described in TP 7119, Section 21.� Complete and submit the Generator Set Alignment Data sheet provided in Section 4 of this work item via CFR. This initial data is for informational purposes only. 3.7 Inspect Vulkan coupling. �The Contactor must remove and inspect the Engine to Generator coupling. �Inspect for any damage or defects. Submit a CFR with a detailed description of the observations and any recommendations for repairs. 3.8 Final generator-engine alignment. �In the presence of the Coast Guard Inspector, following all engine and/or generator maintenance and repairs, measure final Generator shaft to Engine shaft alignment using the two dial indicator method or Laser Shaft Alignment as described in TP 7119, Section 21.� Adjust the alignment as necessary to achieve a satisfactory alignment measurement. Submit a CFR. 3.8.1 The Contractor must re-ream the holes as needed to install new alignment dowels (Pin).� The dowels must be installed on each side and on the forward end (closest to coupling) of the generator. 3.8.2 After alignment is accomplished with acceptable readings, the Contractor must reconnect the coupling, and install coupling guard. 3.8.3 The Contractor must complete and submit the Generator Set Alignment Data sheet provided in Section 4 of this work item via CFR. NOTE Coast Guard personnel will operate all shipboard machinery and equipment. 3.9 Load testing. �The Contractor must provide labor and crane services as necessary for placing load bank at suitable location (i.e., On the pier or the ship). After completion of load bank testing of SSDG, the Contractor must remove all installed equipment and cables used during testing. 3.9.1 Testing plan. The Contractor must submit a plan for load testing of the SSDG in accordance with Caterpillar Publication SEBF9011-26 and TP 7119. Submit the load testing prior to commencing the test. 3.9.1.1 The plan must cover the following topics at a minimum: � Emergency shutdown procedures � Load bank specification and location � Cable locations for load bank � No-load tests � Loaded tests � Data to be collected during tests � All proposed connections, cable and load bank configurations 3.9.1.2 The Contractor must start testing of the SSDG after COR Approval of submitted Test Plan and official acceptance by the Contract Officer (KO). 3.9.2 After placing load bank at suitable location (i.e., On the pier or the ship) the Contractor must install the cables from the load bank to associated SS Switchboard bus bars (i.e.� Back side of SS Switchboard No.1 or No.2S or No.3S).� CAUTION THE BACK SIDE OF THE SWITCHBOARD SHOULD BE ROPED OFF AS A PERSONNEL EXCLUSION AREA (APPROXIMATELY 10 FOOT RADIUS FROM ANY VISIBLE LIVE BUS 3.9.2.1 The Contractor must route the cables from designated SSDG to load bank through hatches and passageway. The Contractor must run cables in overheads as much as possible to avoid trip hazards. NOTE Coast Guard personnel will operate all shipboard machinery and equipment. SAFETY At any point in the load test or operational testing period if the need presents itself the engine � Prime mover may be shut down by the Tech rep with communication to the USCG operational Engineer utilizing the local EOS, E stop or shut down from the switch gear.� Any of the three options will automatically open the SSDG buss breaker 3.9.3 After warmup of SSDG until coolant temperature reaching 140 Degree F, the Contractor must perform the load testing of designated SSDG listed in Table 1 at following load condition. TABLE 3 � LOAD TESTING LOAD HOURS �*No Load 0.5 Hrs 25 % Load 0.5 Hrs 50 % Load 0.5 Hrs 75 % Load 0.5 Hrs 100 % Load 2.0 Hrs No Load 0.5 Hrs * Running no load testing. No load testing will consist of running the engine at idle rpm until the engine coolant temperature reaches 140 deg. F during that warmup time safety testing will be performed for oil psi and temp warning and shut down and coolant temp. warning and shutdown. Shipboard alarm verification will be observed at that time as well. 3.9.3.1 Load bank readings must be taken every 15 minutes of the following parameters: Engine, Coolant temp, oil pressure, battery voltage, boost, intake air temp after the aftercooler, exhaust stack temp left and right bank. In addition to the generator load test form a Caterpillar steady state engine performance file shall be recorded on the engine ECM all related available information. Generator information, voltage reading per phase, amperage readings per phase, HZ, bearing and winding temps if installed. Pre and post-test PSSRP shall be saved on the ECM to provide verification of all available diagnostic codes and events. All electronic files and reports must be sent to the COR and distributed through proper channel. 3.10 Operational test, post repairs.� After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition.� Submit a CFR. 3.11 Touch-up preservation.� The Contractor must prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.) 4 Load test documentation.� After completion of testing, the Contractor must provide Data Sheet of load testing of SSDG to the Contracting Officer. 4.� NOTES RDD/POP: 19Aug24 to 27Aug24
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/aca582ccb0b4412abda9e4437b728c74/view)
 
Place of Performance
Address: Alameda, CA 94501, USA
Zip Code: 94501
Country: USA
 
Record
SN07139195-F 20240725/240723230146 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.