Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 26, 2024 SAM #8277
SOLICITATION NOTICE

Z -- US Forest Svc, Ozark NF, Spring Lake Dam (SLD) Pedestrian Walkway Improvements

Notice Date
7/24/2024 12:45:40 PM
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USDA-FS, CSA EAST 11 Atlanta GA 303092449 USA
 
ZIP Code
303092449
 
Solicitation Number
12445124B0020
 
Response Due
9/18/2024 10:00:00 AM
 
Archive Date
10/03/2024
 
Point of Contact
Steven J Alves, Phone: 8593340524, Cynthia Granderson, Phone: 6019651619
 
E-Mail Address
steven.alves@usda.gov, cynthia.granderson@usda.gov
(steven.alves@usda.gov, cynthia.granderson@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
ALT/REPAIR: All work to be performed under the awarded contract will be in accordance with requirements, including specifications and drawings provided for this project. Project Title(s): Spring Lake Dam (SLD) Pedestrian Walkway Improvements Original Set Aside: Total Small Business Set-Aside (FAR 19.5) NAICS:237990 - Other Heavy and Civil Engineering Construction / PSC Z2KA Repair Or Alteration Of Dams $45M This is a Invitation for Bid (IFB) will result in award of a firm-fixed price contract. Award will be made using a Lowest Price responsive/responsible evaluation. Magnitude: (d) Between $250,000 and $500,000. Location(s): This project area is in the Spring Lake Recreation Area, approximately 4 miles north of Belleville, Arkansas; in Section 27, Township 6 North, Range 23 West, Yell County, Arkansas Scope of Work (summarized): This project includes improvements to the Spring Lake Dam Recreation Area Pedestrian Walkway. The project includes replacement of the existing concrete walkway, improves safety features including the handrails, replaces an existing potable waterline, and rehabilitates the existing Dam stone masonry piers. The original masonry gravity dam structure, located on the southerly end of Spring Lake, was built in 1938. The existing walkway is sited on top of the dam. The walkway is supported on the dam�s stone and mortar piers which includes a total of 15 spans.� The walkway was constructed of reinforced, poured in place, concrete panels which sit on concrete edge beams. These edge beams are embedded into the stone piers at the ends. The walkway sides have handrails and chain-link fencing. SCHEDULE: SITE VISIT: 8/23/2024; Time: 10:00 CT; Location: Spring Lake Dam Recreation Area Pedestrian Walkway POC: POC: Scott Leonard, 479-438-9387, scott.leonard@usda.gov LAST DAY FOR QUESTIONS: 9/05/2024 BIDS DUE: 09/18/2024 1200CT PERIOD OF PERFORMANCE: 270 Days (negotiable) Submittal Method: All bids will be emailed to steven.alves@usda.gov; cc: cynthia.granderson@usda.gov. You may call 859-334-0524 to confirm receipt 12445124B0020 DRAFT PACKAGE_NOT TO BE USED FOR BIDDING for informational purposes only and should not be used for bidding.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/93750a3a8df64d0a89f6e92d85fdeeaa/view)
 
Place of Performance
Address: Paris, AR 72855, USA
Zip Code: 72855
Country: USA
 
Record
SN07141420-F 20240726/240724230115 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.