SOLICITATION NOTICE

56 -- Replace Roofing Staff Housing - FCI Safford

Notice Date
7/24/2024 7:38:31 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238160 — Roofing Contractors
 
Contracting Office
FCI SAFFORD SAFFORD AZ 85548 USA
 
ZIP Code
85548
 
Solicitation Number
15B60924Q00000008
 
Response Due
8/5/2024 1:00:00 PM
 
Archive Date
08/20/2024
 
Point of Contact
Nicasio Garcia, Phone: 9283481368
 
E-Mail Address
ngarcia@bop.gov
(ngarcia@bop.gov)
 
Description
1. FLAT ROOF SECTION: The contractor shall be responsible for the removal and haul away of the existing flat rolled roofing, roof decking, fascia, shingle mold, drip edge, and rain gutters on the flat section located on the back of the staff housing complex. A new conventional framed sloped roof will need to be constructed to have a slope equal to or greater than 3:12 pitch to meet shingle manufactures specifications. The existing rafters will not be removed but the new rafters attached to the existing with any alterations that may be required. The rafters will need to be long enough to make the new soffit 16 inches past the exterior wall. This new section of constructed roof will be required to have � plywood decking or OSB with plywood clips and required fasteners. The contractor will be required to install new synthetic underlayment, sub fascia (traditional lumber), fascia (5/4� LP Smartside engineered wood trim), soffit (LP Smartside plywood panels), shingle mold (1x2 pine), metal drip edge (2�x2�), 30yr Owens Corning asphalt architectural shingles (sierra gray in color), roof jacks, flashings, and rain gutters. 2. PITCHED TRUSS SECTION: The Contractor shall be responsible for the removal and haul away of the existing asphalt shingles, felt(underlayment), shingle mold, metal drip edge, rain gutters, flashings, soffit, fascia, and roof jacks on the entire trussed staff housing complex. A row of sheeting will need to be removed to extend truss tails or install outriggers to make the new soffit overhang 16 inches past the exterior wall. Once that has been removed the contractor will be required to install new synthetic underlayment, sub fascia (traditional lumber), fascia (5/4� LP Smartside engineered wood trim), soffit (LP Smartside plywood panels), shingle mold (1x2 pine), metal drip edge (2�x2�), 30yr Owens Corning asphalt architectural shingles (sierra gray in color), roof jacks, flashings, and rain gutters. 3. Housing will be occupied during construction. All construction activities must be conducted so that housing areas are protected from weather, and that staff living there are minimally impacted by construction. 4. The contractor shall be responsible for caulking, filling holes, priming, and painting all fascia, soffit, and drip edge on the staff housing complex. 5. Required sealant around all penetrations before roof is complete.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/e75819ecbada4340bdab6b57ece4d929/view)
 
Place of Performance
Address: Safford, AZ 85546, USA
Zip Code: 85546
Country: USA
 
Record
SN07141884-F 20240726/240724230119 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.