SOLICITATION NOTICE
56 -- Repair Building S-1832, Camp Casey, Korea (MATOC Only)
- Notice Date
- 7/24/2024 12:41:36 AM
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- 0670 AQ TM CONTRACTING TEA APO AP 96224-5228 USA
- ZIP Code
- 96224-5228
- Solicitation Number
- W90VN824R0062
- Response Due
- 8/13/2024 7:00:00 PM
- Archive Date
- 08/29/2024
- Point of Contact
- MAJ Alexander Duvaldadrian, Phone: 3153961380, CHONGNAK KIM, Phone: 05033221381
- E-Mail Address
-
alexander.c.duvaldadrian.mil@army.mil, chongnak.kim.ln@army.mil
(alexander.c.duvaldadrian.mil@army.mil, chongnak.kim.ln@army.mil)
- Description
- Repair Building S-1832, Camp Casey, Korea (MATOC Only) 2.1.1. Structural Work 2.1.1.1. Repair by replacing existing column w/ steel column. ���� 2.1.2. Architectural Work 2.1.2.1. Floor Work 2.1.2.1.1. Replace deteriorated existing floor tile with new PVCT including VCB or wooden base as shown on new floor plan & interior finish schedule. 2.1.2.1.2. Replace deteriorated existing CMT with new FCT including cement bond coat, waterproof membrane, mortar bed as shown on floor plans, section and details drawings. 2.1.2.2. Interior & Exterior Wall Work 2.1.2.2.1. Replace deteriorated existing gypsum wall board walls with new GWB wall (GWB, normal, water resistant or 'X' type) including metal studs, metal clips and metal bar as shown on floor plans, sections and detail drawings. TP I-1 2.1.2.2.2. Paint all interior walls and designated exterior surfaces as shown on floor plan, detail drawings and interior finish schedule. 2.1.2.2.3. Replace deteriorated existing GCWT with new including cement bond coats, waterproof membrane, plastering w/metal lath and waterproof GWB as shown on floor plans and sections. 2.1.2.3. Interior & Exterior Ceiling/Roof Work 2.1.2.3.1. Replace deteriorated existing ceiling with new acoustical tile ceiling and gypsum wall board (GWB, normal, water resistant or 'X' type) ceiling including ceiling suspension system as shown on floor plan, sections and finish schedule. 2.1.2.3.2. Paint on all interior ceiling surfaces as shown on interior finish schedule and section. 2.1.2.3.3. Replace deteriorated existing insulations with new at bottom of the roof surfaces including fluted metal linings as shown on floor plan, sections and interior finish schedule. 2.1.2.3.4. Replace existing metal roof with new protected metal roof at storage facility area including 2-ply of 12THK plywood sheathings, roof insulations and fluted metal linings at bottom of the roof as shown on elevation, sections and finish schedule. 2.1.2.3.5. Repair by installation of fluid applied waterproofing system on existing metal roof at the straight metal roof area and new protected metal roof at storage facility area including replacement of wooden fascia boards, metal rain gutters and downspouts as shown on floor plan, elevations and finish schedule. 2.1.2.4. Misc. Work 2.1.2.4.1. Replace deteriorated existing doors and door frames with new including hardware sets as shown on new floor plan and door schedule. 2.1.2.4.2. Replace deteriorated existing windows with new including horizontal fireproof type mini blinds. 2.1.2.4.3. Replace deteriorated existing columns with new as shown on floor plan. *See structure drawings. 2.1.2.4.4. Replace deteriorated existing fire extinguishers cabinets (FEC) with new as shown on floor plans and detail drawing. 2.1.2.4.5. Replace deteriorated existing all toilet accessories with new as shown on floor plans, schedule and detail drawings. 2.1.2.4.6. Replace interior & exterior signages with new as shown on floor plan, elevations and signage schedule. 2.1.2.4.7. Replace deteriorated existing bulletin board with new as shown on floor plan, detail drawing and signage schedule. 2.1.2.4.8. Clean the existing main entrance aluminum double doors. 2.1.2.4.9. Replace deteriorated existing concrete stoop and metal canopy with new including wooden step inside the door as shown on new floor plan and pictures. ���� 2.1.3. Mechanical Work 2.1.3.1. Repair the heating and cooling system by installing new split heat pump system, split air conditioning unit, electric wall heater, electric unit heater, valves, piping, insulations, controls, equipment support (Conc. pad), and all associated accessories for HVAC system as shown on drawings. TP I-2 2.1.3.2. Repair the ventilation system by installing new split compact dedicated outdoor air system, exhaust fans, controls, diffusers, register, ducts, insulations, outside air intake louver with birdscreen, motorized damper and all associated accessories for ventilation system as shown on drawings. 2.1.3.3. Repair the plumbing system by installing new electric domestic hot water heater, domestic hot water recirc. pump, electric water cooler, domestic cold and hot water piping system, insulation, sewer and vent piping system, water hammer arrests, floor drain, floor cleanout including plumbing fixtures, and all associated accessories as shown on drawings. 2.1.4. Electrical Work 2.1.4.1. Replace deteriorated existing interior/ exterior lighting fixtures, exit lights, toggle switches, wires and conduits with new. 2.1.4.2. Replace existing watthour meter, current transformers, panelboards, receptacles w/cover plates, associated wiring & conduits with new. 2.1.4.3. Replace deteriorated existing safety switches, motor controllers, junction boxes, control/power wires and conduits for mechanical systems with new. 2.1.4.4. Replace deteriorated fire alarm control system with new addressable fire alarm control and mass notification system panel, manual pull station, smoke detector & relay module, antenna, visual/signal strobes (15 or 75 candela), microphone, speaker (wattage as req'd) device, fire alarm building transmitter, antenna, surge protector, and associated wiring and conduit. 2.1.4.5. Replace deteriorated existing telecommunication system including telephone terminal board, telephone/data outlets w/cover plates, terminal blocks, equipment rack and associated wire & conduit with new. 2.1.4.6. Replace existing exterior underground telecommunication line, accessories with new. 2.1.4.7. Replace existing exterior power distribution system with new including pad mounted transformer. Army Contract Writing System (ACWS) Transition Information for Offerors The Army Contracting Enterprise (ACE) is in the process of deploying new solicitation and contract writing software to Army contracting offices worldwide. Known as the Army Contract Writing System (ACWS), this modern software suite will soon replace most existing Army contract writing systems, including the system used to create and release this Solicitation. During this transition period, Offerors are hereby advised: The Contracting Office may use any combination of contract writing systems to create and release documents related to this solicitation (e.g. solicitation amendments and awards, if any). Due to this: This solicitation may contain different offer submission instructions than other solicitations released by the same Contracting Office (e.g. requiring offer submission via the PIEE Solicitation Module vs. e-mail). Offerors should review all offer submission instructions contained in the solicitation documents and direct any questions or concerns to the Contract Specialist or Contracting Officer. If the Contracting Office switches contract writing systems prior to award, documents you receive from the Contracting Officer or view on SAM.gov or other forums may appear noticeably different than the initial solicitation or previous solicitations or awards from the same Contracting Office. This is normal and expected. A change between contract writing systems may cause important information concerning solicitation response (amendments) or accepted terms (awards) to take on different formatting or appear in different parts of later documents issued. Offerors shall review all documents carefully to locate this important information and direct any questions or concerns to the Contract Specialist or Contracting Officer. The Government does not intend to use the transition between contract writing systems to effect any changes to solicitation or award terms and conditions without accompanying document narratives explicitly stating such changes are deliberate and desired. While the Contract Specialist and Contracting Officer will take care to minimize or eliminate any inadvertent changes when adapting to the new contract writing software, you, as the Offeror, may still be the first to spot such errors. Therefore, Offerors shall: Notify the Contracting Officer immediately if any observed changes, removals, or additions affect your award eligibility, violate or alter existing quote/proposal terms, or could affect Contract performance post-award. Take special care to ensure all fill-in Clauses are populated and remain populated across documents received from the Contracting Office throughout the Solicitation and Award process. Contact the Contracting Officer listed on the first page of the solicitation or solicitation amendment for guidance if you notice or suspect any inadvertent change has occurred between document issuances. The Contracting Officer will correct problems affecting award documents (if any) via bilateral modification, at no cost to the Contractor. Any such modification will reconcile the award with the latest version of this solicitation reflecting deliberate action by the Contracting Officer (e.g. the first issuance if no amendments, or the latest amendment with accompanying narratives), inclusive of any documented pre-award negotiations or accepted supplemental offer terms. In the unlikely event a network disruption, contract writing system error, or financial system error threatens timely award of the requirement set forth in this solicitation, the Contracting Officer: May elect to use alternative mechanisms to obligate funds and allow work or deliveries to legally begin to the benefit of, and with legal protection for, both parties. Will incorporate the latest version of this Solicitation into such mechanisms to serve as a framework for contract execution until any such system problems are resolved. Will ensure any action taken does not conflict with the stated offer evaluation and award methodology of this requirement. Will issue a complete, properly-formatted award accurately reflecting this requirement and all applicable terms and conditions once systems return to normal.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/8de899a7f2fc46a08e0799bfb484515c/view)
- Place of Performance
- Address: Camp Casey, Korea, KR-41, KOR
- Country: KOR
- Country: KOR
- Record
- SN07141888-F 20240726/240724230119 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |