Z -- MINOR-CONST 528-809 NEW EMERGENCY DEPARTMENT ALBANY VAMC

Notice Date
7/25/2024 1:39:17 PM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
242-NETWORK CONTRACT OFFICE 02 (36C242) ALBANY NY 12208 USA
 
ZIP Code
12208
 
Solicitation Number
36C24224R0071
 
Response Due
8/15/2024 9:00:00 AM
 
Archive Date
11/13/2024
 
Point of Contact
Michael A Spivack, Contracting Officer
 
E-Mail Address
MICHAEL.SPIVACK@va.gov
(MICHAEL.SPIVACK@va.gov)
 
Awardee
null
 
Description
STATEMENT OF WORK 528A8-809 Build New Emergency Department General Intention: The Stratton VA Medical Center in Albany, NY has a need for new Emergency Department to be added to the main hospital. The new addition will have connecting corridors to the main hospital core. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, significant excavation and site work, furnish all labor and materials, and perform work for construction of a New Emergency Department as required by the drawings and specifications. Work includes demolition, asbestos abatement, excavation, site work, exterior improvements, general construction, alterations, structural, mechanical, plumbing, electrical work, fire alarm and sprinkler work, medical gas work, lead shielding, installation of equipment provided by third-party vendors, low-voltage communications and controls work, and certain other items. Visits to the site by Contractors may be made as documented in the formal solicitation of the Project. Offices of Fellenzer Engineering LLP, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by the Contracting Officer or duly authorized representative. Before placement and installation of Work subject to tests by a testing laboratory retained by Department of Veterans Affairs as required by the Drawings and Specifications, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspections. Such prior notice shall be not less than three workdays unless otherwise designated by the COR. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. Period of performance: The successful offeror shall begin performance within 15 calendar days after receiving the notice to proceed and complete all work within the 550 calendar days (time specified in the award). Calendar days means every day of the week. Superintendence: The offeror shall provide, from their own staff, a competent 30-hour OSHA certified superintendent. This individual shall be 100% full time dedicated to supervision and assigned to this project while work is being performed on site. If the originally assignment superintendent is not available for any reason then the offeror must notify the Government immediately and provide an alternate competent superintendent. The offeror shall not divide or split up their superintendence duties among multiple projects at the same facility. Each project stands alone and requires a dedicated superintendent to be allocated and funded to that particular project. Commissioning: The commissioning of all required items shall be completed prior to the offeror providing any required training to government staff and the coordination/development of a Final Inspection and the resultant punch list. Punch list: The offeror must notify the Contracting Officer (CO) and Contracting Officer s Representative (COR) of the project s substantial completion. The offeror and Government must establish a date and time to perform a punch list walk through with all stake holders. The offeror is required to complete all punch list items during the established period of performance and not after the 550 calendar days. Autodesk build construction management platform: The Contractor shall utilize VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning and Retro-Commissioning contracts.  There is no user, license, or subscription fee to the contractor for using this cloud-based platform. The Contractor shall accomplish and complete the following tasks upon award of contract: Request access to ACC platform and ProductivityNOW eLearning Site to project VA COR within 14 days of contract award. Only staff that shall utilize the platform to be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc. The access request shall be in writing and include a list of staff. The list shall include the following information: Full Name Company Name Email Address Role/Position on the project (i.e., Project manager, site super) Contractor staff granted access to the ACC platform shall complete ACC training through ProductivityNOW eLearning platform and provide certificates of completion to COR within 12 Calendar days of access being granted. Initial access to ProductivityNOW eLearning platform shall expire after 12 Calendar days after online access is granted. Additional Staff and Subcontractors can be added at any time with a request submission to the project COR as described in section B.1.3.1. C.. The contractor shall only use the ACC platform for contract required submissions, official project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor an increase in contract amount be provided for the contractor s failure to utilize the ACC platform as the project s official communication and collaboration system. Any correspondence out of platform shall not be the governing authority contradicting direction and will be at the contractor s expense. Official project correspondence and collaboration includes but not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys. Contractor shall inform the COR of any staff changes within 2 business days from the change. Staff changes pertains to staff granted access to the ACC platform. Contractor shall request termination of access, replacement of personnel and/or any other action that might impact the contractor ability to maintain required utilization of the platform. Contractor submission requirements cannot be accepted for work to begin without meeting all ACC Platform requirements outlined herein, including completing required ACC platform training.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/d1328b75468a4df28160ae178873fcba/view)
 
Record
SN07142831-F 20240727/240725230117 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.