SOLICITATION NOTICE
F -- Cedar DxP IRSC
- Notice Date
- 7/25/2024 1:37:08 PM
- Notice Type
- Presolicitation
- NAICS
- 115310
— Support Activities for Forestry
- Contracting Office
- USDA-FS, STEWARDSHIP CONTRACTING BRANCH Washington DC 202501138 USA
- ZIP Code
- 202501138
- Solicitation Number
- 12363N24R4022
- Archive Date
- 09/01/2024
- Point of Contact
- Eduardo Cortez, Mark Phillipp, Stewardship Contracting Officer, Phone: 5414101187
- E-Mail Address
-
eduardo.cortez@usda.gov, mark.phillipp@usda.gov
(eduardo.cortez@usda.gov, mark.phillipp@usda.gov)
- Description
- Cedar DxP IRSC � PPS-NPO Stewardship Contracting Branch 12363N24R4022 Willamette National Forest, Middle Fork Ranger District Presolicitation Notice Classification Original Set Aside: NONE Product Service Code:�F099 - NATURAL RESOURCES/CONSERVATION- OTHER NAICS Code:�115310 - Support Activities for Forestry Place of Performance: Westfir, OR 97492 Background: The Willamette National Forest is preparing the Cedar DxP IRSC which shall be awarded under the following Stewardship Authority: Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014�Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999. Stewardship authority grants the Forest Service the authority to aggregate stewardship work activity requirements and solicit those requirements utilizing full and open competition. NAICS: 115310: Support Services for Forestry, Size Standard: $34M Fuels Management Services. ***Some of the DRAFT contract documents are being made available to contractors to get familiar with the requirements. These are not the FINAL contract requirements and information contained in these documents is subject to change.� Final quotes should not be developed nor submitted based on the draft information. *** Project Location: The project is located adjacent to the community of Oakridge, Oregon. The project has units spread across the 127,000 plus acre 2022 Cedar Creek fire. The project stretches from immediately adjacent to the east of the community of Oakridge, OR and over to Waldo Lake. T19S R04E Section 036; T19S R05E Sections 31 and 32; T20S R04E Sections 1, 8, 9, 10, 11, 12, 13, 14, 15, 21, 22, 23, 24, 25, 26, 27, 33, 34, 35, and 36; T20S R05E Sections 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35; T20S R06E Sections 26, 27, 28, 34, 35; T21S R04E 1, 2, 3, 4, 8, 9, 10, 11, 12, 13, 17, 21, 22, and 27; T21S R05E Sections 4, 5, 6, 7, 10, 12, 13, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 27, 28, 29, 33, 34, 35, and 36; T21S R06 E Sections 3, 4, 9, 10, 14, 15, and 16; T22S R05E Sections 1, 2, 8, 12, 16, 17, 21, and 22. Planned Period of Performance: All work is tentatively anticipated to have the following final completion dates: October 15, 2029. Description of Work: The objectives of this project reduce the risks of hazardous fuels that have fallen across or remain standing along important access routes of the 2022 Cedar Creek fire-affected road system so that access to and through the burned area can be restored.� Activities include performing mitigation of risk along road from fire killed/damaged trees, reduction of roadside fuel accumulation and essential maintenance and reconstruction of roads. Cut and Remove Included Timber within 100 feet of roads on Roadside Units in the Contract Area. Cut and Remove Included Timber within the Waldo Lake Units in the Contract Area. Fall and Leave Hazard Trees Units consisting of falling hazardous fire-killed and injured trees within site tree height distances from the roads. Slash Disposal treatment within 0-30 feet of roads from the Contract Area, and within the Waldo Lake Units, and an optional item for slash disposal treatment within 30-100 feet of the roads. Deliver 7,000 logs to a decking location for later use in stream and fish habitat restoration. Road Reconstruction within the Contract Area. Road Maintenance within the Contract Area. Suppression Repair treatments for Dozer Line repair, Log Landing repair, and Slash Treatments 0-30 feet from the road. All Suppression Repair treatments are optional items. Estimated Timber Volume and acres is as follows: The entire project area is estimated at 3,308 acres of roadside hazard tree abatement with associated slash treatments in removal areas. Forest Product volume estimates for the entire project are shown below. Volume quantities are made available with the understanding that values shown are Forest Service estimates and are not guaranteed. Interested Contractors are urged to examine the individual contract areas and make their own estimates.� Approved LIDAR and RAV data has been used to determine volume on the Cedar DxP IRSC. � The Roadside Units/Subdivisions are estimated at 3,228 acres and 150,723 Tons of sawtimber/biomass. The Waldo Units/Subdivisions are estimated at 80.3 acres and 2,910 Tons of biomass. Pre-Solicitation Site Visit Date and Time: Prior to solicitation, the Forest will hold a site visit for prospective contractors to discuss the end results of the project, and to facilitate dialogue on contractual requirements that are anticipated in the contract, and any discuss or consider any operational limitations foreseen by attendees. The site visit will be held on August 9, 2024, at 0900-1300 PT with a meeting location at Middle Fork Ranger District Office, 46375 HWY 58, Westfir, OR 97492. Included Attachments: 1. Cedar DxP IRSC SOI_ DRAFT 2. Cedar DxP IRSC Appendix A_DRAFT 3. Cedar DxP IRSC Appendix B_DRAFT 4. Cedar DxP IRSC Appendix C_DRAFT 5. Cedar DxP IRSC Appendix D_DRAFT 6. Cedar DxP IRSC CAM_DRAFT Service Contract Act and Construction (Davis Bacon) Wage Determinations will be provided when the Cedar DxP IRSC is solicited. It is anticipated that the Request for Proposals with all attachments shall be issued the week of August 12th, 2024. The contract shall be awarded using a best value source selection method; the resulting contract shall be a firm fixed price commercial services contract. The estimated price magnitude for road reconstruction work requirements in all project areas requires that bid guarantees be provided with proposals, and that payment and performance bonds be provided within 10 days of an award. Bonding requirements apply only to road construction work items. Please direct questions in writing to: Eduardo Cortez, eduardo.cortez@usda.gov� Mark Phillipp, mark.phillipp@usda.gov
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/ebc2f428d0b94ea187ce777d4fb0bbf4/view)
- Place of Performance
- Address: Westfir, OR 97492, USA
- Zip Code: 97492
- Country: USA
- Zip Code: 97492
- Record
- SN07143125-F 20240727/240725230120 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |