Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 27, 2024 SAM #8278
SOURCES SOUGHT

65 -- Prep and Pack Station

Notice Date
7/25/2024 1:22:53 PM
 
Notice Type
Sources Sought
 
NAICS
339112 — Surgical and Medical Instrument Manufacturing
 
Contracting Office
255-NETWORK CONTRACT OFFICE 15 (36C255) LEAVENWORTH KS 66048 USA
 
ZIP Code
66048
 
Solicitation Number
36C25524Q0505
 
Response Due
8/1/2024 12:00:00 PM
 
Archive Date
08/16/2024
 
Point of Contact
Jon Lutmer, Phone: 4104463862
 
E-Mail Address
Jonathan.lutmer@va.gov
(Jonathan.lutmer@va.gov)
 
Description
STATEMENT OF WORK (SOW) FOR Prep and Pack Stations VETERANS HEALTH ADMINISTRATION 14 February 2024 *ALL ITEMS HEREIN THAT MENTION BRAND NAME PRODUCTS MAY BE SUBSTITUTED FOR A LIKE OR SIMILAR ITEM* 1. INTRODUCTION This solicitation is to provide the Robert J. Dole VAMC with ( 6 ) prep and pack stations and 1 wrapping workstation� for use in the Sterile Processing Services for preparing instrumentation for surgical procedures. 2. SCOPE OF WORK The contractor shall provide all personnel, equipment, tools, materials, supervision, hardware, installation, trainings, and any necessary educational materials needed for the successful utilization of the workstations by Robert J. Dole VAMC staff. 3. INSTALLATION & CLEAN UP Contractor representatives must check in with either the contracting officer�s representative (COR), Supervisor, Assistant Chief, or Nurse manager. when they arrive on-site and check out upon completion of work each day. Contractor on-site visits shall be coordinated with the COR (or designee) before being scheduled or conducted. Contractor staff shall always be professional and shall take all necessary precautions to maintain a safe environment for the occupants. Contractor shall protect all items from damage. The Contractor shall take precaution against damage to the building(s), grounds, and furnishings. The Contractor shall repair or replace any items related to building(s) or grounds damaged accidentally or on purpose due to actions by the Contractor. 4. TECHNICAL REQUIREMENTS ���� A. Salient Features: Stainless Steel Electro-mechanical height-adjustability Table pegboard, standard pegs throughout Integrated footrest PC tower shelf mounted to underside. Tabletop Ruler is etched into the surface of assembly and packing tables. Pull out shelf stores work area underneath prep and pack tables. Table Light Hood Lighted Shelves LED light bar LED Magnifier Task Light On/Off switch, and dimmable lighting Wall bracket for mounting accessories The Ergotron� Wall Mounted Keyboard and Monitor Arm The Ergotron� VESA Scanner Shelf Wall mounted rail for plastic shelf bins Plastic shelf bins Prep and Pack Organization Rail lets users hang peel pouch rolls, stickers, and other sterilization materials. Storage drawer Two-pronged hook to hang brushes and accessories. Suspended shelf mounted underneath Ergonomic Workstations B. Technical Requirements: 60�L x 32�W height-adjustable workstation Power: 15A, 120V, or 60H required 5. TRAINING The contractor shall provide an on-site training program for SPS personnel. Training for SPS personnel must provide SPS staff with the tools and knowledge to fully operate the devices and conduct checks per the manufacturer�s instructions and hospital regulations, as well as answer any questions personnel may have regarding the new equipment. Contractor shall coordinate all training dates with COR (or designee) who will communicate internally with appropriate VA staff. Contractor shall maintain records of training participants and whether training was completed or not, to be provided to COR upon request. If applicable, Contractor shall include all travel, registration, and other associated costs to provide this training in their proposal. Contractor shall protect all items from damage. The Contractor shall take precaution against damage to the building(s), grounds, and furnishings. The Contractor shall repair or replace any items related to building(s) or grounds damaged accidentally or on purpose due to actions by the Contractor. 6. WARRANTY/MAINTENANCE SERVICE The warranty shall include all manufacturer recommended Preventive Maintenance procedures for its duration. The contractor shall provide at minimum a 3-year warranty. The warranty shall include the following: all parts, all accessories, and all software shall be covered under the manufacturer�s warranty and shall include all parts and labor. The contractor shall provide documentation of all work completed (corrective maintenance, preventive maintenance, software updates, etc.) within 3 business days of completion to the contracting officer�s representative or designee. The warranty period shall not begin until after the Dole VAMC COR or designee has accepted the products delivery, installation, and functionality. The contractor shall provide documentation of all work completed (corrective maintenance, preventive maintenance, etc.) within 3 business days of completion to the contracting officer�s representative or designee. 7. SECURITY REQUIREMENTS The C&A requirements do not apply, and a Security Accreditation Package is not required. 8. HOURS OF WORK Normal hours of operation are Monday through Friday, 8:00 a.m. to 4:30 p.m. Central Standard Time, excluding Federal holidays. The Government hereby provides notice and Contractor hereby acknowledges receipt that Government personnel observe the listed days as holidays: New Year's Day �������������������������������������������� January 1 Martin Luther King's Birthday ��������������������� Third Monday in January President's Birthday �������������������������������������� Third Monday in February Memorial Day ����������������������������������������������� Last Monday in May Juneteenth������������������������������������������������������ June 19 Independence Day ���������������������������������������� July 4 Labor Day ����������������������������������������������������� First Monday in September Columbus Day ���������������������������������������������� Second Monday in October Veterans Day ������������������������������������������������ November 11 Thanksgiving Day ���������������������������������������� Fourth Thursday in November Christmas ������������������������������������������������������ December 25 9. PERIOD OF PERFORMANCE The contractor shall have system fully installed no later than 90 days after contract award.� Coordination between the contracting officer and the site point-of-contact/contracting officer�s representative will be required after contract award to establish the start date to complete any required site preparations. 10. DELIVERY & LOCATION INFORMATION Robert J. Dole Medical Facility Building 34 NX Warehouse 5500 East Kellogg Wichita Kansas, 67218
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/1c0bb149f8a04c25ba4c5cd19cfc7558/view)
 
Place of Performance
Address: Wichita, KS 67218, USA
Zip Code: 67218
Country: USA
 
Record
SN07144487-F 20240727/240725230131 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.