Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 24, 2024 SAM #8306
SOLICITATION NOTICE

J -- BOILER USEFUL LIFE INSPECTION

Notice Date
8/22/2024 1:32:43 PM
 
Notice Type
Solicitation
 
NAICS
541380 — Testing Laboratories
 
Contracting Office
246-NETWORK CONTRACTING OFFICE 6 (36C246) HAMPTON VA 23667 USA
 
ZIP Code
23667
 
Solicitation Number
36C24624Q1234
 
Response Due
8/26/2024 9:00:00 AM
 
Archive Date
09/25/2024
 
Point of Contact
Warren A Pennil, Contract Specialist
 
E-Mail Address
warren.pennil@va.gov
(warren.pennil@va.gov)
 
Awardee
null
 
Description
Page 4 of 4 QUESTIONS AND ANSWERS 36C24624Q1234 BOILER USEFUL LIFE INSPECTION 1. Are the Original Manufacturers Data Reports (ASME Forms), including all Power Piping Forms, available for each boiler?  A: Will we have to locate the documents. 2. Are the last annual inspection reports available? If applicable, have all deficiencies been repaired and boiler certificates for integrity and operation been issued? A: Yes have the last annual inspection reports, yes the deficiencies been repaired. 3. It is proposed that two boilers will be available the first week for inspection. If this changes due to government delays, can the contractor submit a change order to the contract? A: Yes, two boilers will be available the first week. 4. Since the plant will be live during internal inspections, is it known that all energy sources (feedwater, gas, air and especially steam) can provide double valve protection without leaking by the 2nd valve? A: Yes. 5. For the non-return valve and 2nd stop valve, has the free blow drain (valve in between the NRV and 2nd Stop Valve) been verified to have zero leak by the 2nd valve?  A: Yes. 5. Is it going to be the responsibility of the VA to Lock Out/Tag Out each boiler?  A: The VA and the contractor. 6. Who will be responsible for providing a Confined Space Chit & Air Monitoring? With training, will the VA provide a whole watch?   A: The contractor is responsible for the Confined Space and has to gas free the boiler interior. 7. Are the Steam drum and the Mud drum included in the inspection (for all 3 boilers)? A: Yes, this is an internal and external inspection including the steam & mud drum. 8. Can you provide the lates inspection reports and any Non-Destructive Data? A: Yes.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/fb087faa6ab44027910bdd3c86fb3fe4/view)
 
Record
SN07181640-F 20240824/240822230120 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.