Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 20, 2024 SAM #8333
SOLICITATION NOTICE

Y -- CA FTNP SEKI 13(2) Mineral King Road

Notice Date
9/18/2024 12:00:25 PM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF24B000017
 
Response Due
9/24/2024 1:00:00 PM
 
Archive Date
10/09/2024
 
Point of Contact
Jorey Deml, Ryan Phillips
 
E-Mail Address
cflacquisitions@dot.gov, cflacquisitions@dot.gov
(cflacquisitions@dot.gov, cflacquisitions@dot.gov)
 
Description
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Full and Open Competition with HUBZone price preference PROJECT NUMBER: CA FTNP SEKI 13(2) PROJECT NAME: MINERAL KING ROAD PROJECT DESCRIPTION:� The project proposes to rehabilitate up to 15.20 miles of Mineral King Road located within Sequoia and Kings Canyon National Park (SEKI).� The project is located east of Visalia in Tulare County, CA. SCOPE OF THE WORK:� The scope includes pulverization of the existing pavement, aggregate base placement, and asphalt paving of the roadway.� Parking lots will be rehabilitated or paved to improve visitor access.� Soldier pile walls, soil nail walls, and areas of special rock embankment will be constructed throughout the project to stabilize the roadway.� The project also includes drainage improvements such as ditch paving and grading, inlet installation, culvert replacement, and inlet and outlet protection measures. �� The Mineral King Road Project is in remote mountainous terrain with areas of limited roadway bench width.� Public access will have to be maintained during construction with intermittent allowable closures depending on season and time.� The road is inaccessible during winter due to extreme weather and snowpack.� The project is in an environmentally sensitive resource area within the National Park Service. PRINCIPAL WORK ITEMS: 22,500 LF Ditch Excavation 1,900 CY Rip Rap 700 CY Special Rock Embankment 1800 SF Soil Nail Retaining Wall 6,500 Tons Roadway Aggregate, Method 2 7.5 Miles Full Depth Reclamation, Method 2 4.5 Miles Full Depth Reclamation, Method 2 with Cement 26,000 Tons Asphalt Pavement 380 LF Steel H Piles, In Place 9,800 LF 24� to 48� Culverts 70 Each Inlet (Concrete Box Inlet) 37,000 LF Paved Ditch, Asphalt 80 Each Dry Stacked Headwall ANTICIPATED SCHEDULE:� Pre Bid Site Visit Onsite Meeting� � October 2024.� See attachment for details. Advertisement � September 2024 Construction � April 2025 through October 2027 ESTIMATED COST RANGE:� Between $25,000,000 and $35,000,000
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/eb49f6b29c5b41ef82548f8f2df895ff/view)
 
Place of Performance
Address: CA, USA
Country: USA
 
Record
SN07216057-F 20240920/240918230116 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.