Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF OCTOBER 06, 2024 SAM #8349
SOLICITATION NOTICE

Y -- NV FLAP 500(1) Red Rock Trail

Notice Date
10/4/2024 7:29:57 AM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF24B000016
 
Archive Date
11/04/2024
 
Point of Contact
Laura Vallejos, Leslie Karsten
 
E-Mail Address
CFLcontracts@dot.gov, CFLcontracts@dot.gov
(CFLcontracts@dot.gov, CFLcontracts@dot.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
THIS IS NOT A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS PROJECT WILL BE ADVERTISED AS A TOTAL SMALL BUSINESS SET-ASIDE. PROJECT NUMBER: NV FLAP 500(1) PROJECT NAME: Red Rock Trail PROJECT DESCRIPTION:� The Red Rock Trail project is in Las Vegas, Nevada in the outskirts of Summerlin and into the entrance of Red Rock Conservation Area. This project includes construction of a multi-use trail and pedestrian bridge along with reconstruction of State Highway 159 widening. SCOPE OF THE WORK:� The project is located adjacent to the Red Rock Conservation Area which is a highly environmentally sensitive area. It includes construction of approximately 1 mile of paved multi-use trail, widening of State Highway 159 for additional turn lane width and construction of a 210-foot pedestrian bridge with drilled shafts. The project includes multiple Partners with Bureau of Land Management, Nevada Department of Transportation and Clark County Public Works. The project will be broken up into a Schedule A and an Option X. Schedule A includes all the trail and bridge. Option X includes work related to State Highway 159. PRINCIPAL WORK ITEMS: Schedule A: Embankment construction � 6,000 CUYD Riprap, Class 7 � 1,400 CUYD Roadway aggregate � 2,000 TON Asphalt concrete pavement � 1,400 TON Precast, Prestressed concrete box beam � 820 LNFT Drilled shaft � 260 LNFT Option X: Roadway aggregate � 800 TON Asphalt concrete pavement � 2,100 TON ANTICIPATED SCHEDULE:� Advertisement � October 2024 Award � December 2024 Construction Start � January 2025 Construction Finish � June 2025 The estimated price range of the project work is between $5,000,000 and $10,000,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/93758ee8aecf466aac4a84ae77f8d83c/view)
 
Place of Performance
Address: Las Vegas, NV, USA
Country: USA
 
Record
SN07233873-F 20241006/241004230107 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.