SOLICITATION NOTICE
56 -- 77361 - FOM Cage with Installation
- Notice Date
- 10/17/2024 5:12:32 AM
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 238990
— All Other Specialty Trade Contractors
- Contracting Office
- FA8571 MAINT CONTRACTING AFSC PZIM ROBINS AFB GA 31098-1672 USA
- ZIP Code
- 31098-1672
- Solicitation Number
- FA857125Q0006
- Response Due
- 10/23/2024 12:00:00 PM
- Archive Date
- 11/07/2024
- Point of Contact
- Patrick Hulett, Jeffery Pruitt
- E-Mail Address
-
patrick.hulett@us.af.mil, jeffery.pruitt.1@us.af.mil
(patrick.hulett@us.af.mil, jeffery.pruitt.1@us.af.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- The Contractor shall provide all the: tools, parts, materials, equipment, transportation, and labor of the Facilitate Other Maintenance (FOM) Cage w/Install at Bldg 149 for the Maintenance Support Group (AMXG) at Robins Air Force Base (AFB), Georgia. Please see the attached files for additional information. Update: 16 October 2024 The purpose of this update is to extend this combined synopsis/ solicitation. Any questions asked by contractors will be provided below with the answers.� Any contractor that has submitted a quote is free to make updates and resubmit by the requested time and date. FAQ: Q:�The post will be plated but it is ok to drill the post in the ground and anchor them? A: The post plates will be anchored to the floor; posts will not penetrate floor. Q: How should the quote be submitted? A:�Please submit your quote to the primary point of contact listed within this solicitation. PDF or Word document is preferred. Just provide a price based on the line items found within the Letter RFQ, but feel free to provide a more detailed breakdown if preferred. Q:�What gauge wired is required for the fencing?� Will that be 9 gauge? A:�The Fence will be 9Ga wire. Q:Should barb wire be installed at the top of the fence? A: No, barb wire is not needed. Q:How big should the corner, end, and line posts be?� Should the terminal posts all be 3� and line posts 2.5�? A: Sizes on the posts are 2 �� �Terminal Post , 2� Line Post & �1 5/8� Top Rail Q:Will there only be two man gates? A: 2 Ea. 10� Sliding Gates , 2 Ea. �20� Sliding Gates , 2 �Ea.� 3� Personnel (swinging) Gates Q:Should anchors be used to secure the posts in lieu of core drilling into the slab? A:�All posts will need to be flanged and anchored into the concrete.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/a8db130ccb6e474ea58980ad80c7562d/view)
- Place of Performance
- Address: Warner Robins, GA 31098, USA
- Zip Code: 31098
- Country: USA
- Zip Code: 31098
- Record
- SN07243323-F 20241019/241017230112 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |