Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF DECEMBER 22, 2024 SAM #8426
SPECIAL NOTICE

A -- Notice of Intent to Sole Source- Multi-Domain Artillery Cannon (MDAC)/Hypervelocity Projectile (HVP) under Other Transaction Agreement (OTA)

Notice Date
12/20/2024 9:12:31 AM
 
Notice Type
Special Notice
 
NAICS
541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
 
Contracting Office
W6J1 RCCTO BELVOIR FORT BELVOIR VA 22060-5806 USA
 
ZIP Code
22060-5806
 
Solicitation Number
W50RAJ25R0005
 
Response Due
1/4/2025 10:00:00 AM
 
Archive Date
01/19/2025
 
Point of Contact
Joshua E. Flinn, Barbara Cantrell
 
E-Mail Address
joshua.e.flinn.civ@army.mil, barbara.a.cantrell2.civ@army.mil
(joshua.e.flinn.civ@army.mil, barbara.a.cantrell2.civ@army.mil)
 
Description
THIS IS A NOTICE OF INTENT TO AWARD A SOLE-SOURCE PROTOTYPE PROJECT AND IS NOT A REQUEST FOR PROTOTYPE PROPOSALS OR WHITE PAPERS. The United States Army Rapid Capabilities and Critical Technologies Office (RCCTO) intends to issue a sole source Request for Prototype Proposal (RFPP), in accordance with 10 U.S.C. � 4022, to BAE Systems Land & Armaments L.P., 4800 East River Road, Minneapolis, MN 55421, for the award of a prototype Other Transaction Agreement (OTA) for the Multi-Domain Artillery Cannon (MDAC) and Hypervelocity Projectile (HVP) prototypes. U.S. Army RCCTO has a requirement to develop and deliver a full Multi-Domain Artillery Cannon System (MDACS) Battery no later than Q4FY27 followed by an Operational Demonstration (OD) in FY28. A full MDACS Battery consists of eight (8) Multi-Domain Artillery Cannons (MDAC), four (4) Multi-Function Precision Radars (MFPR), two (2) Multi-Domain Battle Managers (MDBM), and separately, no less than 144 Hypervelocity Projectiles (HVP). The MDACS mission is to defend Joint Force fixed and semi-fixed locations against attack by a broad spectrum of Unmanned Aerial Systems (UAS), Cruise Missiles (CM), Fixed Wing (FW), Rotary Wing (RW), and other advanced air and missile threats and to complement existing air and missile defenses by operating in integrated operational scenarios. Based on market research conducted in July-October 2024, to include Requests for Information (RFI) for both the MDAC and HVP, each published on 08 July 2024 and closed on 24 July 2024, the U.S. Army RCCTO believes BAE Systems Land & Armaments L.P. is the only responsible source capable of developing and delivering both the MDAC and HVP prototypes within the required schedule; competition of this effort is not practicable and will not meet mission fielding requirements. This notice of intent is not a request for competitive proposals or white papers and no solicitation document will be posted for either requirement. However, vendors who previously provided a capability statement in response to the MDAC and/or HVP RFIs, and have new information, not previously submitted, that suggests their ability to meet either requirement may submit for consideration. Any response that repeats previous submissions will not be considered. Subcontracting opportunities may be available and should be sought with the prime, BAE Systems Land & Armaments L.P. Interested sources who submit data are responsible for appropriately marking information if it is proprietary in nature. The Government shall not reimburse interested sources for any information provided. No request for capability briefings will be honored. A determination by the Government not to compete this proposed contract based on responses to this notice is solely within the discretion of the Government. Interested vendors must respond to this notice on or before 1300 EST, 4 January 2025 to the Agreements Officer, Joshua Flinn, at joshua.e.flinn.civ@army.mil.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/ce716137751d49b294b7c646e5bcc539/view)
 
Record
SN07298688-F 20241222/241220230111 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.