34 -- FY26 USSF SSC Cornbread Frequency Converter and Installation, Kapaun Delta Base, Germany

Notice Date
11/22/2025 3:51:43 AM
 
Notice Type
Sources Sought
 
NAICS
335999 — All Other Miscellaneous Electrical Equipment and Component Manufacturing
 
Contracting Office
FA5613 700 CONS PK APO AE 09021-3076 USA
 
ZIP Code
09021-3076
 
Solicitation Number
FA561326Q0003
 
Response Due
11/26/2025 6:00:00 AM
 
Archive Date
12/11/2025
 
Point of Contact
Aubreeana Taylor, Brendan O'brien
 
E-Mail Address
aubreeana.taylor@us.af.mil, brendan.obrien.13@us.af.mil
(aubreeana.taylor@us.af.mil, brendan.obrien.13@us.af.mil)
 
Small Business Set-Aside
NONE No Set aside used
 
Description
SOURCES SOUGHT FOR: Frequency Converter and Installation (FA561326S0003) THIS IS A MARKET RESEARCH/SOURCES SOUGHT NOTICE SEEKING INFORMATION ONLY.THIS IS A SOURCES SOUGHT ANNOUNCEMENT ONLY SEEKING RESPONSES IN ORDER TO DETERMINE PARTICIPATION IN THIS ACQUISITION. THIS IS NOT A SOLICITATION/REQUEST FOR PROPOSAL. THIS SHOULD NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT TO ISSUE A SOLICITATION OR ULTIMATELY AWARD A CONTRACT, NOR DOES IT RESTRICT THE GOVERNMENT TO A PARTICULAR ACQUISITION APPROACH OR OTHERWISE REIMBURSE RESPONDENTS FOR ANY COSTS INCURRED IN PREPARATION OF A RESPONSE TO THIS NOTICE. 1.0 Requirement Description: This is an intended procurement for the delivery, installation, and commissioning of a containerized 50/60 Hz frequency converter system to support mission-critical operations to support the Kapaun Delta Base restricted area (Cornbread power sub-station, Germany). The system shall provide continuous and stable 60 Hz output power required for U.S. equipment and infrastructure operating in a host-nation 50 Hz environment. In addition to the power conversion system itself, the Government requires a complete, turnkey solution including all necessary materials, labor, installation support, and commissioning activities. The Contractor shall provide all cables, connectors, hardware, controls, and integration components required for full system installation, along with delivery to the referenced location, on-site commissioning by an Original Equipment Manufacturer (OEM)-certified technician, and operator training following system handover. 2.0 Requirement Specificificaitons: See the Performance Work Statement (PWS) attached. 2.1 Frequency Converter: The contractor shall furnish one (1) frequency converter 50/60 Hz meeting or exceeding the following: - Input Voltage: 400 / 50 V - Input Frequency: 50 Hz - Output Power: 600 kVA / 480 kW - Output Voltage: 208 V (Ph/Ph) / 120 V (Ph/N) - Output Frequency: 60 Hz - Installed inside container; Included OEM accessories: - Control cabinet (IP 43) - Control cabinet heater - I/O card with 6 relays 2.2 Installation: The frequency converter shall be mounted into the appropriate outdoor container. The contractor shall install all required electrical components required to properly operate the unit. This includes but is not limited to wiring, conduit (all wiring shall be in conduit), circuit breakers, disconnects, junction boxes, etc. Contractor is responsible for immediate testing and verifying fully operational unit following connection to ensure proper function. 2.3 Containerized Enclosure: The Contractor shall furnish a fully equipped container enclosure with: - MGS switchgear -MGS converter -Dimensions: Approximate dimensions: 8000 x 2500 x 2900 mm --C5-M corrosion protection - 80 mm rock wool insulation - CO? extinguisher, emergency lamp, hearing protection - Electrical cabling, lighting, sockets, standstill heating 2.4 Electrical Installation: Control and power cabling within the container system and cables connecting sub-station to frequency converter - MGS switchgear 2.5 Ventilation system: - Weatherproof grilles with animal protection - Motorized louver inlet/outlet dampers - Winter recirculation flap 2.6 Materials and Installation: The Contractor shall provide all materials required for complete installation, including but not limited to: - Power and control cables - Connectors, conduits, grounding materials - Hardware, fittings, brackets - All tools, labor, and integration components 2.7 Commissioning: Upon completion of installation services, the contractor shall test the frequency converter and controls, in the presence of Government personnel. If any component of the system does not function properly, the contractor shall make necessary adjustments/repairs at no additional cost to the Government. The Contractor shall perform commissioning in accordance with OEM protocol, including: - OEM technician onsite for two days - Max 10 hours/day including travel - Full operational testing and verification - System handover upon successful commissioning 2.8 Frequency Converter Training: Upon completion of installation services, the contractor shall test the frequency converter and controls, in the presence of Government personnel. If any component of the system does not function properly, the contractor shall make necessary adjustments/repairs at no additional cost to the Government 2.9 Government Personnel Training: The contractor shall provide start-up and operational training and provide at least 2 copies of manufacturer's user manuals to the designated Government point of contact (POC) identified at time of award. Operator training shall include: - Operations overview - Safety procedures -Basic troubleshooting 2.10 Shop Drawings: The Contractor shall deliver all components to the Cornbread Power Supply Sub-Station, Kapaun Delta Base (Incoterms 2020), including packaging for truck transport and off-loading coordination. 2.11 Warranty: The contractor shall provide Government personnel with equipment warranty (12 months) and documentation upon installation completion. 3.0 Required Delivery: No later than 23 October 2026 to the Cornbread Power Supply Sub-station, Kapaun Delta Base, Germany (INTERESTED VENDORS SHALL SEE ATTACHED PWS FOR ADDITIONAL IMPORTANT INFORMATION REGARDING THIS INTENDED PROCUREMENT) 4.0 The anticipated NAICS Code is 335999, ALL OTHER MISCELLANEOUS ELECTRICAL EQUIPMENT AND COMPONENT MANUFACTURING This Sources Sought is issued solely for information and planning purposes only and is not a Request for Proposals or Quotes (RFP or RFQ) or an obligation on the part of the Government to acquire any services. Responses to this sources sought are not offers and cannot be accepted by the Government to form a binding contract. The Government reserves the right to determine how it should proceed as a result of this notice. Furthermore, those who respond to this sources sought should not anticipate feedback with regard to its submission. The Government will not pay any cost incurred in response to this sources sought. All costs associated with responding to this sources sought will be solely at the responding party's expense. The information provided in this sources sought is subject to change and is not binding on the Government. Please carefully review the attachments and respond according to the directions stated below. Documentation of technical expertise and capability must be presented in sufficient detail for the Government to determine that your company possesses the necessary functional area of expertise, certification, authorization and experience to compete for this acquisition. It is imperative that business concerns responding to this notice articulate their capabilities clearly and adequately. Responses to this notice are strictly voluntary. 5.0 Interested Vendor Responses: 5.1 Please include the following in your response: 1. Name of company 2. Primary Point of Contact 3. Institution or organization affiliation 4. Email address 5. Phone number 6. Company's business size and CAGE/UEI codes 7. Brand-Name and Part Number available Do NOT include the following in the response: 1. Do not submit formal proposals or offers; 2. Do not submit requests to be considered for award or to be notified of a future solicitation; 3. Do not submit requests to be added to a mailing or distribution list; 4. Do not submit questions or comments not related to this sources sought; 5. Do not respond via telephone. 5.2 How to Submit Responses: 1. Submit the required information to Aubreeana Taylor, Contracting Officer, at aubreeana.taylor@us.af.mil and A1C Brendan Obrien, Contract Specialist, at brendan.obrien.13@us.af.mil. 2. Please include "" SOURCES SOUGHT � Frequency Converter & Installation"" in the e-mail subject line. 3. If you have any questions regarding this source sought, please submit them via e-mail. 4. The sources sought closing date is Wedenesday November 26, 2025, at 0900 Eastern Standard Time (EST) / 1500 Central European Time (CET) / . 6.0 Points of Contact: 6.1 Primary Point of Contact: Aubreeana Taylor Contracting Officer aubreeana.taylor@us.af.mil Secondary Point of Contact: A1C Brendan O'brien Contract Specialist brendan.obrien.13@us.af.mil 6.2 Contracting Office Address: 700th Contracting Squadron/PKC Beschaffungsstelle der U.S. Luftwaffe Kapaun Air Station, Geb. 2767 67661 Kaiserslautern
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/2db5ac250c04430287b85cf9861d97cb/view)
 
Place of Performance
Address: KAPAUN DELTA BASE (KAISERSLAUTERN), DE-RP, DEU
Country: DEU
 
Record
SN07649488-F 20251124/251122230032 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.