Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 27, 2025 SAM #8767
SOLICITATION NOTICE

Y -- Stringout Construction (Rehabilitation) at Ensley Engineer Yard (EEY).

Notice Date
11/25/2025 7:53:15 AM
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W07V ENDIST MEMPHIS MEMPHIS TN 38103-1894 USA
 
ZIP Code
38103-1894
 
Solicitation Number
W912EQ26RA001
 
Archive Date
01/30/2026
 
Point of Contact
Jessica Lurry, Phone: 901-579-2055, Monica Pitchford, Phone: 901-544-0838
 
E-Mail Address
Jessica.M.Lurry@usace.army.mil, Monica.A.Pitchford@usace.army.mil
(Jessica.M.Lurry@usace.army.mil, Monica.A.Pitchford@usace.army.mil)
 
Description
The work consists of furnishing all labor, materials, tools, and equipment to complete the work as shown and as specified for the Stringout Replacement at EEY, and incidental related work. The project is divided into a base project and six (6) options. The work involves: Removal of the existing steel ramp that extends from the yard to the floating docks; Demolition and removal of existing ramp abutment; Removal of existing timber piles, steel pipe piles, and concrete piles; Demolition and removal of concrete piles and pile caps from existing railroad trestle; Excavation, dredging and disposal of materials; Installation of steel floats (GFE); Installation of a new landing barge; Providing new steel pipe piles and steel-framed pile clusters; Providing donut fenders; Providing new utilities (electrical power, lighting, lightning protection, potable water, fire water, telecom, compressed air); Construction of a new steel connector bridge; Construction of an electrical substation, including equipment foundation; Construction of abutment and landside approach to the connector bridge; All earthwork activities for connector bridge; and all incidental related work. The base project work shall be completed sequentially from Phase 1 to Phase 2, to allow continued operation of the Ensley Engineer Yard. Phase 1 shall be completed before the start of Phase 2.For options when awarded, they they shall be completed in the sequence directed by the Government.Acquisition Strategy: The acquisition will be conducted as an unrestricted procurement with a HUBZone Price Evaluation Preference, using a Best Value Tradeoff source selection process. A Project Labor Agreement (PLA) will be required.Magnitude of Construction: Between $25,000,000 and $100,000,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/812f91e8ee5344db90d17139e0e59c17/view)
 
Place of Performance
Address: Memphis, Tennessee 38103
Zip Code: 38103
 
Record
SN07651545-F 20251127/251125230039 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.