Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 01, 2026 SAM #8833
SOLICITATION NOTICE

Y -- Rosebud Lift Station Construction

Notice Date
1/30/2026 7:10:24 AM
 
Notice Type
Solicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
DIV OF ENGINEERING SVCS - SEATTLE SEATTLE WA 98121 USA
 
ZIP Code
98121
 
Solicitation Number
75H70126R00018
 
Response Due
3/2/2026 2:00:00 PM
 
Archive Date
07/31/2026
 
Point of Contact
Daniel Cotto, Phone: 2404617841, Andrew E. Hart, Phone: 206-375-4443
 
E-Mail Address
daniel.cotto@ihs.gov, andrew.hart@ihs.gov
(daniel.cotto@ihs.gov, andrew.hart@ihs.gov)
 
Small Business Set-Aside
ISBEE Indian Small Business Economic Enterprise (ISBEE) Set-Aside (specific to Department of Interior and Indian Health Services)
 
Description
Amendment 1: Replace an attachment. Attachment J01 Plans RLSC was corrupted and is replaced by attachment J01 Plans RLSC 30Jan2026. All questions or concerns shall be routed through daniel.cotto@ihs.gov; do not attempt to contact people mentioned in the attachment. Remember to acknowledge this and all future amendments with your proposal. Solicitation: Rosebud LiftStation Construction Location: 1319 Soldier Creek Road,Rosebud, SD 57570 County: Todd POP: 120 calendar days Construction Magnitude: Between$500,000 and $1,000,000 Contract Type: firm-fixed-priced TERO: TERO is applicable. See SectionH.50. Goal: The existing lift station has been inplace since the early 1990s. Since its cre-ation the hospital anticipates increased ex-pansion in the emergency department,added on Tribal programs (dialysis, detox,Tribal Health Administration Building),added on 19 more quarters units, and is an-ticipating adding an additional 23 quartersunits. The existing pumps are facing re-placement every 1-2 years due to the unan-ticipated growth, but due to the growth weneed to consider increasing the capacity ofthe wet well. In addition to switching fromstandard submersible pumps to chopperpumps to accommodate the random ob-jects that get flushed into the system. InJuly both pumps ended up failing and theyhad to not only replace the pumps but payfor sewage disposal to circumvent overflow. A separate project is in the works to beginremediating/replacing damaged sewermains due to inflow and infiltration. This construction solicitation will requirethe full removal and replacement of the liftstation for the Rosebud complex. The exist-ing lift station provides wastewater serviceto the hospital quarters units, and severaltribal program buildings. Once installationis complete the new lift station will take thefull sanitary load for the area currently be-ing serviced by the existing lift station andbe sized to handle expansion in the future.Then the existing lift station consisting of the wet well, dry well, pumps and pipingwill be demolished. The new lift station willconsist of a wet well, a dry well, installationof chopper pumps, and force main connec-tion. This project will also include a newcontrol system to allow the facility to moni-tor flow into the lift station and the status ofthe equipment.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/33e5012058fe4790aec22d64d0f281be/view)
 
Place of Performance
Address: Rosebud, SD 57570, USA
Zip Code: 57570
Country: USA
 
Record
SN07702128-F 20260201/260130230038 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.