Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 01, 2026 SAM #8833
SOLICITATION NOTICE

Z -- Berth 13 Structural Repairs, Portsmouth Naval Shipyard, Kittery ME .

Notice Date
1/30/2026 1:08:08 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
NAVFACSYSCOM ATLANTIC NORFOLK VA 23508-1278 USA
 
ZIP Code
23508-1278
 
Solicitation Number
N6247026R0016
 
Response Due
3/6/2026 11:00:00 AM
 
Archive Date
03/21/2026
 
Point of Contact
Bruce Davis, Brad Beisswanger
 
E-Mail Address
bruce.w.davis5.civ@us.navy.mil, brad.beisswanger.civ@us.navy.mil
(bruce.w.davis5.civ@us.navy.mil, brad.beisswanger.civ@us.navy.mil)
 
Small Business Set-Aside
NONE No Set aside used
 
Description
READ THE ATTACHED SOLICITATION DOCUMENT IN ITS ENTIRETY. YOU WILL NEED TO REQUEST Attch J - Contract Docs_RM24-2895 Specs, DWGs & RPTs VIA EMAIL, AND SEND ALL PPIs TO THE CONTRACT SPECIALIST LISTED BELOW: Bruce Davis: bruce.w.davis5.civ@us.navy.mil This project provides structural repairs to Berth 13 to restore deck loading capacity and extend usablelife of structure, repair deteriorated deck sections,and repair piles, caps, beams, deck, and steel reac-tion frame connections to allow continued use ofthe berth. Berth 13 is an open wharf structure water-front facility constructed in the 1940�s consisting ofconcrete piles including previous jacket repairs,concrete wharf deck, and steel reaction frame withtimber decking along the outboard face of the wharfstructure. Total approximate construction area isapproximately 25,000 square feet (SF). Berth 13 repair work will include both full (1,600 SF) and partial demolition (area to be determined) to various portions of the concrete wharf deck; outage coordination, removal and replacement of utilities in the way of concrete repairs; repairs to the reaction frame; repairs to the landside fascia beam; and repairs to crane rail beams, pile caps, pile jackets and anodes. All demolition and construction activities must prevent debris from entering the river below. Underside wharf deck, pile jacket and anode repairs require the capability to work from barges and other floating platforms; as well as meet strict safety protocols. AMENDMENT 0001 1. Revise the Solicitation 2. Add/Update Clauses 3. Add Site Visit Information 4. Answer PPIs: Pre-Proposal Inquiry Log_B13-1 The following Attachments will be added: Attch K - Site Walk Information_B13 Attch L - SECNAV 5512 1_REV MAY 2021_exp 2027 Attch M - DBIDS 5500b Attch N - Pass Office Virtual Line Guidance
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/52a6173a28e3481c8480ebe67983770f/view)
 
Place of Performance
Address: Kittery, ME 03904, USA
Zip Code: 03904
Country: USA
 
Record
SN07702146-F 20260201/260130230038 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.