MODIFICATION
Z -- NRM CONSTRUCTION -528A8-18-801 Renovate for Cardiac Cath & IR
- Notice Date
- 2/6/2026 2:44:23 PM
- Notice Type
- Solicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- 242-NETWORK CONTRACT OFFICE 02 (36C242) ALBANY NY 12208 USA
- ZIP Code
- 12208
- Solicitation Number
- 36C24226R0033
- Response Due
- 3/6/2026 9:00:00 AM
- Archive Date
- 06/04/2026
- Point of Contact
- Michael A Spivack, Contracting Officer
- E-Mail Address
-
MICHAEL.SPIVACK@va.gov
(MICHAEL.SPIVACK@va.gov)
- Awardee
- null
- Description
- SCOPE OF WORK VA PROJECT NO. 528A8-18-801 RENOVATION FOR CARDIAC CATH AND VIR This Scope of work is for construction services for the completion of project 528A8-18-801: Renovation for Cardiac Cath Lab and Vascular Interventional Radiology Lab located at the Albany VA Medical Center 113 Holland Avenue, Albany NY 12208. All work shall be completed within 790 calendar days from issuance of the Notice To Proceed. 1.3 STATEMENT OF BID ITEM(S) A. ITEM I, GENERAL CONSTRUCTION: Work includes all labor, material, equipment and supervision to perform: 1. The required general construction work on this project including, but not limited to, demolition of existing architectural items, new walls, new floor, new ceilings, new finishes, temporary facilities and any other addition/demolition alterations necessary for a complete and operable system. 2. The required mechanical construction work on this project including, but not limited to, demolition of existing HVAC and hydronic systems, new constant volume air terminal units, new ductwork, new hydronic piping, new controls, new pressure monitoring equipment and any other addition/demolition alterations necessary for a complete and operable system. 3. The required plumbing construction work on this project including, but not limited to, demolition of existing plumbing fixtures, demolition of domestic/sanitary/venting/medical gas/RO piping, new plumbing fixtures and any other addition/demolition alterations necessary for a complete and operable system. 4. The required fire protection construction work on this project, including but not limited to, demolition or relocation of existing sprinkler heads, new sprinkler heads, new fire protection piping and any other addition/demolition alterations necessary for a complete and operable system. 5. The required electrical and fire alarm construction work on this project including, but not limited to, demolition of existing power and lighting systems, new power circuits, new lighting fixtures, relocation of existing fire alarm equipment, new fire alarm devices, installation/removal of temporary heat detectors in the working areas, and any other addition/demolition alterations necessary for a complete and operable system. 1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR A. Detailed Drawings and Specifications have been attached to this solicitation. 1.5 CONSTRUCTION SECURITY REQUIREMENTS A. Security Plan: 1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project. 2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations. B. Security Procedures: 1. General Contractor s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/6fbbe705861c44bc984dfa13f1e65698/view)
- Record
- SN07707186-F 20260208/260206230039 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |