Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 19, 2026 SAM #8851
SOLICITATION NOTICE

56 -- 56--NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ

Notice Date
2/17/2026 10:18:09 AM
 
Notice Type
Solicitation
 
NAICS
212319 — Other Crushed and Broken Stone Mining and Quarrying
 
Contracting Office
FWS, OVER SAT G/S Falls Church VA 22041 USA
 
ZIP Code
22041
 
Solicitation Number
140F0S26Q0004
 
Response Due
2/19/2026 10:00:00 AM
 
Archive Date
03/06/2026
 
Point of Contact
Sung, Robert, Phone: 5038722825
 
E-Mail Address
robert_sung@fws.gov
(robert_sung@fws.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
NV-STILLWATER NWRC-HUNTER RD GRAVEL PROJ Type 2 Class B base course with Tailgate spread for Fallon NV. See SOW in solicitation packet for specifications. Provide a statement that you understand the standard for Type 2 Class B base course as defined in the SOW and include your CAGE code in your submission. Email Robert_Sung@fws.gov for questions and your quotes. RFI Q&A response Q1: After reviewing this requirement with our subcontractor, we received the following clarification from them: ""If the trucks ran consecutively, they could all dump in sequence, allowing the refuge staff time to work the material before the trucks returned for their second and third trips. The total daily tonnage can be adjusted to suit your needs by increasing or decreasing the number of trucks. We anticipate approximately 800-1,000 tons per shift. The material would be delivered using belly dump trains, leaving a window for the refuge staff to spread. We would revise the proposal to include minimum truck spacing. However, doing so would limit roughly half the trucks to only two loads per day, increasing the cost per ton. Based on this scenario and eight trucks per day, spacing would be approximately 15-30 minutes between loads, followed by about 1.25 hours of downtime between the last truck in the first rotation and the first truck returning for the second rotation. This would result in approximately 800 tons per shift."" Based on this, strict adherence to the minimum 15-minute spacing requirement would materially affect operational efficiency and increase the cost per ton. We would respectfully like to inquire whether there is any flexibility in the delivery spacing requirement. Specifically: A. Would consecutive dumping be acceptable if coordinated safely and efficiently with the grading contractor? B. Is the 15-minute minimum interval mandatory throughout the entire shift, or could it be adjusted during certain delivery windows? C. Would alternative staging or sequencing methods be considered, provided safety and site control are maintained? A1: The refuge does have some flexibility on the spacing of the trucks and could be coordinated at that time with the project coordinator. During the work day - we will have a refuge staff member who is stationed to take the tickets from drivers and direct them when it is safe to unload. However, we have completed similar projects at least three times in the past 5 years with various contractors. A 15-minute interval between trucks was generally what they averaged between trucks just based on how long it took the for each load to be filled between the first and the next truck at the gravel pit. Across the projects, delivery has averaged between 800-1k tons per day. For the specific questions: A. Yes, consecutive dumping can be coordinated with the refuge staff who will be completing the gravel grading. B. The 15 minute interval would not be mandatory and could vary throughout the shift, but would need to be coordinated with staff on site. C. Alternative staging or sequencing methods could be considered, provided safety and site control are maintained. The contractor would be responsible for coordinating with the project manager on site and ultimately would be responsible for ensuring the gravel is delivered to its final location on the delivery route.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/4860b3c2c90f40d483c4174e6c4c2efa/view)
 
Record
SN07718116-F 20260219/260217230046 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.