SOLICITATION NOTICE
V -- CENTAM Guardian26 Line Haul HND SLV ""Subject to Availabilities of Funds""
- Notice Date
- 2/23/2026 2:22:00 PM
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 48411
—
- Contracting Office
- 0410 AQ HQ CONTRACT FORT SAM HOUSTON TX 78234-5046 USA
- ZIP Code
- 78234-5046
- Solicitation Number
- W912QM26PA005
- Response Due
- 2/27/2026 10:00:00 AM
- Archive Date
- 03/14/2026
- Point of Contact
- MAJ Dustin L. Caranci, Phone: (520) 944-7168, CPT Chuanchuan Sun, Phone: 5207258956
- E-Mail Address
-
dustin.l.caranci.mil@army.mil, chuanchuan.sun2.mil@army.mil
(dustin.l.caranci.mil@army.mil, chuanchuan.sun2.mil@army.mil)
- Description
- *FUNDS ARE NOT PRESENTLYAVAILABLE FOR THIS REQUIREMENT ANDIS SUBJECT TO AVAILABILITY OF FUNDS IN ACCORDANCE WITH FAR 52.232-18* The Regional Contracting Office-Soto Cano is seeking to obtain support to provide Line Haul Service between Soto Cano Air Base, Honduras to Multiple Locations in El Salvador. Contractor shall provide non-personal services The Contractor shall provide all personnel, equipment, supplies, facilities, flatbeds, lowboys, Removable Goose Neck (RGN), 10K forklift with extended forks at least 72 inches, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Contractor line haul services with drivers to transport supplies, materials, equipment, and containers safely and expeditiously to include where the Contractor shall coordinate with Soto Cano AB, JTF-B J-4 to accurately process all required entry passes documentation for deployment and redeployment before equipment arrival. The Contractor shall accomplish all services in coordination with the COR as defined in this PWS. The Contractor shall perform to the standards in this contract. POP: 07 April 2026 -15 May 2026 Performance Work Statement Has Been Updated Four changes are listed below: 1. Para 4.4 From: two (2) pressure washers To: Six (6) pressure washers 2. Para 5.2.3.13 From: 5.2.3.13. Line Haul APOE Deployment: Pick up from Ilopango El Salvador, (FOS) site will be conducted on/about 6 April and On/about 28 April 2026. On 09 April pick up from Ilopango and deliver to 4 Abrigada de Infanteria el Paraiso Chalatenango. Will also drop of at La Union. COR will keep contractor abreast of time and dates of aircraft arrival. To: From 5.2.3.13. Line Haul APOE Deployment: Pick up from Ilopango El Salvador, (FOS) site will be conducted on/about 6 April and On/about 28 April 2026. On about 12 April pick up from Ilopango and deliver to 4 Abrigada de Infanteria el Paraiso Chalatenango. Will also drop of at La Union. COR will keep contractor abreast of time and dates of aircraft arrival. 3. Para 5.2.3.17.a From: Honduras Equipment Requirements: The contractor shall provide six (6) pressure washers (minimum 90 PSI) as well as any additional equipment and personnel to ensure that the equipment is 100% free of pest infestations, soil, and dirt both inside and outside the container, including lip areas, recessed sections, ledges, wheel wells, axles, undercarriage, and other common areas that may accumulate dirt. To: Ilopango El Salvador Equipment Requirements: The contractor shall provide six (6) pressure washers (minimum 90 PSI) as well as any additional equipment and personnel to clean and ensure that the equipment is 100% free of pest infestations, soil, and dirt both inside and outside the container, including lip areas, recessed sections, ledges, wheel wells, axles, undercarriage, and other common areas that may accumulate dirt. 4. Deliverables Schedule #8 From: Honduras Equipment Requirements: The contractor shall provide six (6) pressure washers (minimum 90 PSI) as well as any additional equipment and personnel to ensure that the equipment is 100% free of pest infestations, soil, and dirt both inside and outside the container, including lip areas, recessed sections, ledges, wheel wells, axles, undercarriage, and other common areas that may accumulate dirt. To: Ilopango El Salvador Equipment Requirements: The contractor shall provide six (6) pressure washers (minimum 90 PSI) as well as any additional equipment and personnel to clean and ensure that the equipment is 100% free of pest infestations, soil, and dirt both inside and outside the container, including lip areas, recessed sections, ledges, wheel wells, axles, undercarriage, and other common areas that may accumulate dirt.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/dc6563d70936491ab8b2d714b9790d4f/view)
- Place of Performance
- Address: HND
- Country: HND
- Country: HND
- Record
- SN07723953-F 20260225/260223230037 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |