COMMERCE BUSINESS DAILY ISSUE OF JANUARY 10,1995 PSA#1259Yoshio Matsuda, Director-General, Chubu Regional Construction Bureau
(Moc), 2-5-1 Sannomaru, Naka-Ku, Nagoya-Shi 460, Japan 99 -- JAPAN: SOL KENSETSU KOGYO SHIMBUN: 01/05/95 PG. 2. DUE 130095
POC Tel 81/52/962-6311 X2521 S1623 Construction of underground utility
duct opening time and date 13:00, feb. 28, 1995. Open 1) Construction
Title Construction of odaka underground utility duct on route 1 for fy
' 94; 2) site from narumi-cho to odaka-cho, midori-Ku, Nagoya- Shi; 3)
summary a) closed shield tunneling 2,271 meters in length (shield
Section circular, 5 85 meters in circumference); and B) work on natural
ventilation system; 4) Construction period approx. 24 months (720
days); 5) main materials to be used steel lining gegments 87 rings,
reinforced concrete segments 2,179 rings; 6) deadline for submission of
application forms/related documents for qualification screening 16 00,
jan. 17, 1995; 7) contact for tender documents: contract division,
General Affairs Department, Chubu Regional Construction Bureau,
Ministry of Construction, 2-5-1 Sannomaru, Naka-Ku, Nagoya-Shi 460
eligible tender participants 1) designated consortia pre-qualified by
the Chubu Regional Construction Bureau and comprised of firms that meet
the following criteria a) firms that do not fall under articles 70 and
71 of the cabinet order concerning budget, auditing, and accounting;
B) firms qualified for open competitive tendering on Public works by
the Chubu Regional Construction Bureau; C) firms that score 1,000
points or more in a formula calculated from bidding company's objective
criteria at the time of application for qualification; D) firms not
undergoing bankruptcy procedures; e) firms that have -- since 1988 as
the main contractor -- actually carried out closed-type shield
tunneling (of shield circumference 3 meters or more) in a city area
(within a densely-populated area as measured by the 1990 census) note:
only Construction projects in which bidder has had a 30 percent or
greater share are eligible for consideration; F) firms not currently
suspended from designation by the Director of the Chubu Regional
Construction Bureau; G) firms not related by capital or personnel to
the contractors involved in this project; 2) designated consortia that
can assign to the Construction site a full-time field representative
and a full-time chief engineer or engineering supervisor who meet the
following criteria a) can assign to this project a field representative
who have -- in the past as field representative -- had experience of
closed-type shield tunneling in a city area (within a densely-
populated area as measured by the 1990 census); B) a chief engineer
must satisfy the following (1) and (2), and an engineering supervisor
must satisfy (3), as well as (1) and (2) (1) is qualified as a
certified first- class Construction supervisor or equivalent or higher;
(2) has -- since 1988 as the main contractor -- had experience of
closed-type shield tunneling (of shield circumference 3 meters or more)
in a city area (within a city area as measured by the 1990 census); and
(3) in the case of engineering supervisor, is qualified to supervise
designated Construction works bid documents must be obtained directly
from the submitting agency, not from U S. Embassy. Date of publication
in ''kensetsu kogyo shimbun'' 010595. Post contact/prepared by gtaevs
Please send a copy of your response to: Commercial Section (FCS TOP),
American Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to TC0240..
(0006) Loren Data Corp. http://www.ld.com (SYN# 0175 19950109\99-0001.SOL)
99 - Miscellaneous Index Page
|
|