|
COMMERCE BUSINESS DAILY ISSUE OF JANUARY 11,1995 PSA#1260Vladimir Skudarnov, Chief Architect, Kazaeroproject, Design Institute,
8 Marta St., 21, Almaty, Kazakhstan, 480002 99 -- KAZAKHSTAN: POC Tel 7-3272-63-70-72 7/3272/308085, 308096 FAX
7-327-581-1576 (INTERNATIONAL) 8-3272-639011 (WITHIN N.I.S.) S1611
airport reconstruction product data a detailed product description:
cooperation with a foreign partner in terms of reconstruction of the
existing airport terminal for international flights. B product
specifications/technical data: C quantity: 1 D U.S. dollar value:
multimillion e purchase needed by: January 21, 1995 F other
information: response data a response language: English/Russian,
Russian preferable B best way to respond: mail C from manufacturers
only: N D information desired from U.S. firms: letter of
introduction/application, short description of activity/company history
e primary buying factor: companies' experience and capability F other
information: company data a type of business: Design activity in the
field of air transportation, Design of airport terminals B year
established: 1972 C number of employees: 250 D annual sales: N/a e
member of business chamber: N/a F Bank name and address: N/a G U.S.
firms represented: N/a H other information: Post remarks the Almaty
international airport, republic of Kazakhstan, has announced the open
international Tender for reconstruction of the existing airport
terminal for international flights the announcement was made through
kazakhstanskaya pravda newspaper on December 30, 1994 the Tender
commission includes representatives from the kazakhstani government,
ministry of transport and communications, Almaty city administration,
airport and Kazaeroproject currently, the existing Almaty airport
terminal serves primarily domestic flights according to the initial
thoughts of the Tender organizers, the building would be reconstructed
to serve all international flights and some domestic flights the
contractor would also act as an investor because the kazakhstani side
is not able to finance the project as this is a TOP priority project,
the kazakhstanis can present the guarantees of the kazakhstani
government the costs of the contractors would be covered by sharing
profits Kazaeroproject Design Institute is a developer of the technical
assignment and will be the main expert reviewing proposals from foreign
companies the Institute has 22 years experience in Design of airports
and airport terminals for different cities of the former soviet union
the applicant should buy the package of the Tender documentation from
Kazaeroproject before January 21, 1995 the package costs 1,000 USD and
includes information on the terms of Tender, the technical assignment,
and a set of drawings of the existing terminal building payment can be
made in cash or by a Bank transfer the applicant should develop and
present proposals within two months after the announcement of the
Tender announcement for additional information, contact U S. and
foreign Commercial service (Matthew Doyle, Alexander katkov), U S.
Embassy, 531 seyfullin St, room 501, Almaty, Kazakhstan 480083 Please
send a copy of your response to: Commercial Section (FCS TOP), American
Embassy, Almaty, Department of State, Washington, DC 20521-7030, Refer
to 0008.. (0009) Loren Data Corp. http://www.ld.com (SYN# 0439 19950110\99-0002.SOL)
99 - Miscellaneous Index Page
|
|