Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JANUARY 17,1995 PSA#1263

National Institute of Standards and Technology, Acquisition and Assistance Division, Building 301, Room Bll7, Gaithersburg, MD 20899

66 -- ZYGO LASER INTERFEROMETER SOL 52SBNB5C8607 DUE 022495 POC Marsha Rodgers (301) 975-6339/Contracting Officer: Ruth Ann Maris The National Institute of Standards and Technology (NIST) intends to negotiate on a sole source basis with Zygo Corporation, Middlefield, Connecticut, for Laser Interferometer, controller, video monitor and MetroPro Analysis software--F.O.B. Destination, Gaithersburg, MD-- Required Delivery Time 90 days--This is a sole source requirement because the system needs to be a DOE existing Zygo Mark 4 Phase Shifting Interferometer. NIST has a joint project with the DOOOE Y-12 facility in Oak Ridge, Tennessee to develop a system for measuring the thermal expansion coefficient of end standards. The interferometer above needs to be 100% compatible with the Y-System to allow the two systems to function as one system; the software will be exactly the same and the instrument resolution and functions are identical--See Note 22.(0012)

Loren Data Corp. http://www.ld.com (SYN# 0266 19950113\66-0009.SOL)


66 - Instruments and Laboratory Equipment Index Page