COMMERCE BUSINESS DAILY ISSUE OF JANUARY 18,1995 PSA#1264Kunitaro Matsuoka, Director-General, 4-1-3 Asahi-Cho, Takamatsu-Shi,
Kagawa-Ken 760 99 -- JAPAN: SOL KENSETSU KOGYO SHIMBUN: 01/10/95 PG. 5. DUE 143095
POC Tel 81/878/23-2111 S1622 Construction of tunnel opening time and
date 14:30, feb. 28, 1995. Open 1) Construction Title Construction of
the shimokawa tunnel on the tokushima Expressway; 2) site from aza-
shindenyama, shibau-Cho to aza-hirami, shimokawa-Cho, kawanoe-Shi,
ehime-Ken; 3) summary this project involves Construction of a Highway
(tentatively two-lane) of 1,715 meters in length (earth work volume
320,000 cubic meters), including excavation of a tunnel (at one site,
875 meters), substructure work for a bridge (at one site, 354 meters),
and superstructure and substructure work for a bridge (at one site,
121 meters); total length 1,715 meters; width - Highway portion 10 50
meters X 1, bridge portion 8 50 meters X 2, tunnel portion 9.50 meters
X 1; earth work volume 320,000 cubic meters; tunnel at one site, 875
meters; bridge - superstructure and substructure work at one site 121
meters, substructure work only at one site 354 meters, 6 abutments, 27
piers; foundation work - concrete compaction piles (1 2 meters in
diameter, 382 meters in total length), caisson-type piles (2 5 meters
in diameter, 129 meters in total length), caisson-type piles (3.0
meters in diameter, 187 meters in total length), caisson-type piles (3
5 meters in diameter, 35 meters in total length); viaduct at one site;
and cross structure - culvert box at one site, culvert pipe at one
site; 4) Construction period 1,110 days; 5) main materials to bb used
approx. 29,000 cubic meters of concrete, approx. 2,000 tons of
reinforcing steel, approx 700 tons of asphalt compounds, approx 500
meters of guard Rail; 6) documents for qualification screening 16:00,
jan. 20, 1995; 7) contact for Tender documents contract Division,
procurement and right-of-way Department, Takamatsu Construction Bureau,
Japan Highway Public Corporation, 4-1-3 Asahi-Cho, Takamatsu-Shi 760
eligible Tender participants firms qualified to participate in this
project's bidding must satisfy all of the following conditions and have
their qualifications for this project's bidding screened and confirmed
by the Director of the Takamatsu Construction Bureau 1) firms that do
not fall under article 4 of the contract regulations of Japan Highway
Public Corporation; 2) firms pre-qualified for open competitive
tendering on Road and earth work by the taxamatsu Construction Bureau
of Japan Highway Public Corporation for fy 93/94, and consortia
comprised of two qualified firms; 3) firms that have -- in the past
five years (since 1989) as the main contractor -- actually carried out
Construction of a tunnel of at lrast 0 7 kilometer in length and at
lbast 50 square meters in designed inner Section by the '' natm''
method note: only onstruction projects in which bidder has had a 30
pbrcent or greater share are eligible for consideration, and in the
case of a consortium, all member firms must have a similar experience;
4) firms that can assign to the Construction site a field
Representative or a full-time chief engineer or engineering supervisor
who meets the following criteria has had experience of tunneling by
the ''natm'' method as field Representative or as chief engineer or
engineering supervisor in the past five years (since 1989); 5) firms
not suspended from designation in no 7 zone by Japan Highway Public
Corporation; 6) in the case of a consortium, each member firm must
satisfy the following criteria a) has been in operation for at least
five years in qualified business under the Construction business law;
B) can assign to the Construction site a full- time engineering
supervisor qualified for this project under the conntruction business
law or a full- time nationally-licensed chief engineer; and C) has an
at least 30 percent share of involvement, and T he rbpresentative firm
must have the greatest share firms pre-qualified by the Construction
minister regarding items (a) and (B) in evaluation of their management
operations are exempted from these criteria; and 7) firms not related
by capital or personnel to the contractors involved in this project
(see Tender documents for details) bid documents must be obtained
directly from the submitting agency, not from U S. Embassy. Date of
publication in ''kensetsu kogyo shimbun'' 011095. Post contact/prepared
by gtaevs Please send a copy of your response to: Commercial Section
(FCS TOP), American Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to
TC0260.. (0013) Loren Data Corp. http://www.ld.com (SYN# 0437 19950117\99-0003.SOL)
99 - Miscellaneous Index Page
|
|