COMMERCE BUSINESS DAILY ISSUE OF JANUARY 18,1995 PSA#1264Kunitaro Matsuoka, Director-General, Takamatsu Construction Bureau,
Japan Highway Public, Corporation, 4-1-3 Asahi-Cho, Takamatsu-Shi,
Kagawa-Ken 760 99 -- JAPAN: SOL KENSETSU KOGYO SHIMBUN: 01/10/95 PG. 5. DUE 133095
POC Tel 81/878/23-2111 S1622 Construction of tunnel opening time and
date 13:30, feb. 28, 1995. Open 1) Construction Title Construction of
the second ikeda tunnel on the tokushima Expressway; 2) site aza-
ikeminami to aza-toge, ikeda-Cho, miyoshi-gun, tokushima- Ken; 3)
summary this project involves Construction of a Highway (tentatively
two-lane) of 2,737 meters in length (earth work volume approx. 340,000
cubic meters), including excavation of a tunnel (at one site, 1,280
meters in length) and substructure work for a bridge (at two sites, 150
meters); total length 2,737 meters; width - Highway portion 10.50
meters X 1, bridge portion 9.00 meters X 1, tunnel portion 9 50 meters
X 1; earth work volume 340,000 cubic meters; tunnel at one site 1,280
meters; bridge - substructure work only at two sites 150 meters, 4
abutments, 4 piers; foundation work - concrete compaction piles (1 0
meter in diameter, 180 meters in length), caisson-type piles (2 0
meters in diameter, 14 meters in length), caisson-type piles (2 5
meters in diameter, 59 meters in length), caisson-type piles (3 0
meters in diameter, 19 meters in length); and cross structure - culvert
boxes at eight sites, culvert pipes at two sites; 4) Construction
period 1,110 days; 5) main materials to be used approx. 18,000 cubic
meters of concrete, approx 600 tons of reinforcing steel, approx 500
tons of asphalt compounds, approx. 400 meters of guard Rail; 6)
deadline for submission of application forms/related documents for
qualification screening 16 00, jan. 20, 1995; 7) contact for Tender
documents: contract Division, procurement and right-of-way Department,
takamatshu Construction Bureau, Japan Highway Public Corporation,
4-1-3 Asahi-Cho, Takamatsu-Shi 760 12 eligible Tender participants:
firms qualified to participate in this project's bidding must satisfy
all of the following conditions and have their qualifications for this
project's bidding screened and confirmed by the Director of the
Takamatsu Construction Bureau 1) firms that do not fall under article
4 of the contract regulations of Japan Highway Public Corporation; 2)
firms pre-qualified for open competitive tendering on Road and earth
work by the Takamatsu Construction Bureau of Japan Highway Public
Corporation for fy 93/94, and consortia comprised of two qualified
firms; 3) firms that have -- in the past five years (since 1989) as the
main contractor -- actually carried out Construction of a tunnel of at
least 1 0 kilometer in length and at least 50 square meters in
dbsigned inner Section by the '' natm'' method note: only Construction
projects in which bidder has had a 30 percent or greater share are
eligible for consideration, and in the case of a consortium, all member
firms must have a similar experience; 4) firms that can assign to the
Construction site a field Representative or a full-time chief engineer
or engineering supervisor who meets the following criteria has had
experience of tunneling by the ''natm'' method as field Representative
or as chief engineer or engineering supervisor in the past five years
(since 1989); 5) firms not suspended from designation in no 7 zone by
Japan Highway Public Corporation; 6) in the case of a consortium, each
member firm must satisfy the following criteria a) has been in
operation for at least five years in qualified business under the
Construction business law; B) can assign to the Construction site a
full- time engineering supervisor qualified for this project under the
Construction business law or a full- time nationally-licensed chief
engineer; and C) has an at least 30 percent share of involvement, and
the Representative firm must have the greatest share firms
pre-qualified by the Construction minister regarding items (a) and (B)
in evaluation of their management operation s are exempted from these
criteria; and 7) firms not related by capital or personnel to the
contractors involved in this project (see Tender documents for details)
bid documents must be obtained directly from the submitting agency, not
from U S. Embassy. Date of publication in ''kensetsu kogyo shimbun''
011095. Post contact/prepared by gtaevs Please send a copy of your
response to: Commercial Section (FCS TOP), American Embassy, Tokyo,
Unit 45004, APO Ap 96337, Refer to TC0261.. (0013) Loren Data Corp. http://www.ld.com (SYN# 0438 19950117\99-0004.SOL)