Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF JANUARY 18,1995 PSA#1264

Tsugito Hatano, Director-General, Niitata Construction Bureau, Japan Highway Public, Corporation, 1-1 Tenjin, Niigata-Shi, Niigata-Ken 950

99 -- JAPAN: SOL KENSETSU KOGYO SHIMBUN: 01/10/95 PG. 5. DUE 150095 POC Tel 81/25/243-3911 S1622 Construction of tunnel opening time and date 15:00, mar. 28, 1995. Open 1) Construction Title phase-one Construction of the sakai tunnel on the hokuriku expressway; 2) site asahi- Cho-sakai, shimo-shinkawa-gun, toyama-Ken; 3) summary this project is to construct a Highway of 1,300 meters in length (earth work volume approx 94,000 cubic meters), mainly involving excavation of a tunnel (at one site, 1,300 meters in length); total length 1,300 meters; width - tunnel portion 8.5 meters; earth work volume 94,000 cubic meters; and tunnel at one site - 1,300 meters; 4) Construction period 780 days (winter recess jan. 5 to mar 5); 5) main materials to be used: 7,900 cubic meters of concrete, 70 tons of reinforcing steel; 6) documents for qualification screening 16:00, feb. 9, 1995; 7) contact for Tender documents contract division, procurement and right- of-way department, Niigata Construction Bureau, Japan Highway Public Corporation, 1-1 Tenjin, Niigata-Shi 950 eligible Tender participants firms qualified to participate in this project's bidding must satisfy all of the following conditions and have their qualifications for this project's bidding screened and confirmed by the Director of the Niigata Construction Bureau 1) firms that do not fall under article 4 of the contract regulations of Japan Highway Public Corporation; 2) consortia comprised of two firms pre-qualified for open competitive tendering on Road and earth work by the Niigata Construction Bureau of Japan Highway Public Corporation for fy 93/94; 3) all member firms must have - - in the past five years (since 1989) as the main contractor -- actually carried out Construction of a tunnel of at least 1 0 kilometer extension and at least 50 square meters designed inner Section by the ''natm'' method note: only Construction projects in which bidder has had a 30 percent or greater share are eligible for consideration; 4) firms that can assign to the Construction site a field Representative or a full-time chief engineer or engineering supervisor who meets the following criteria in the past five years (since 1989) as field Representative or as chief engineer or bngineering supervisor, has constructed a tunnel by the ''natm'' method; 5) firms not suspended from designation in no 5 zone by Japan Highway Public Corporation; 6) firms that can present an adequate plan for tunneling; 7) each member firm must satisfy the following criteria a) has been in operation for at least five years in qualified business under the Construction business law; B) can assign to the Construction site a full-time engineering supervisor qualified for this project under the Construction business law or a full-time nationally- licensed chief engineer; and C) has an at least 30 percent share of involvement, and the Representative firm must have the greatest share firms pre-qualified by the Construction minister regarding items (a) and (B) in evaluation of their management operations are exempted from these criteria; and 8) firms not related by capital or personnel to the contractors involved in this project (see Tender documents for details). Bid documents must be obtained directly from the submitting agency, not from U S. Embassy. Date of publication in ''kensetsu kogyo shimbun'' 011095. Post contact/prepared by gtaevs Please send a copy of your response to: Commercial Section (FCS TOP), American Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to TC0254.. (0013)

Loren Data Corp. http://www.ld.com (SYN# 0445 19950117\99-0011.SOL)


99 - Miscellaneous Index Page