COMMERCE BUSINESS DAILY ISSUE OF JANUARY 18,1995 PSA#1264Construction Budget, Koji Kato, Director-General, Administration
Division, Kyoto University, Yoshida-Honmachi, Sakyo-Ku, Kyoto-Shi
606-01 99 -- JAPAN: SOL KENSETSU KOGYO SHIMBUN: 01/10/95 PG. 2. DUE 110095
POC Tel 81/75/753-2308 S1542 Construction of school building opening
time and date 11:00, mar. 3, 1995. Open 1) Construction Title
Construction of school building for the Division of physics, the
faculty of engineering, Kyoto University; 2) site on the campus of
Kyoto University, Yoshida-Honmachi, Sakyo-Ku, Kyoto-Shi; 3) summary a)
use of building: educational facility for conducting of experiments
and Research by the Division of physics; B) structure and number of
stories steel- framed reinforced concrete Construction, eight stories
above ground and one story below ground; C) size of building land area
475 square meters, total floor area 4,280 square meters; and D) site
area 162 379 square meters; 4) Construction period approx. 13 months
(390 days); 5) main materials to be used approx. 4,640 cubic meters of
concrete, approx 580 tons of steel frame, approx 390 tons of
reinforcing steel; 6) deadline for submission of application
forms/related documents for qualification screening 17:00, jan. 24,
1995; 7) Section, planning Division, facilities Department, Kyoto
University, Yoshida-Honmachi, Sakyo-Ku, Kyoto-Shi 606-01 eligible
Tender participants 1) firms that do not fall under articles 70 and 71
of the cabinet order concerning Budget, auditing, and Accounting; 2)
firms grade-''a'' qualified for open competitive tendering on
Construction works by the ministry of education, science, and culture
for goj fy 93/94; 3) firms that score 1,100 points or more in a ''P''
value obtained from an evaluation of bidding company's management
operations at the time of application for qualification; 4) firms that
have since 1989 actually carried out Construction of a school building
or Research facility, made of steel-framed reinforced concrete,
six-stories or more and at least 3,000 square meters total floor area
note: only Construction projects in which bidder has had a 30 percent
or greater share are eligible for consideration; 5) firms that can
assign to the Construction site a full- time chief engineer or
engineering supervisor who meets the following criteria a) is qualified
as a certified first-class Construction supervisor or architect; B) has
had since 1989 Construction experience as described in item (4) above;
and (C) in the case of engineering supervisor, is qualified to
supervise designated Construction works; 6) firms not currently
suspended from designation by the official in charge of outlays; and 7)
firms not related by capital or personnel to the contractors involved
in this project bid documents must be obtained directly from the
submitting agency, not from U S. Embassy. Date of publication in
''kensetsu kogyo shimbun'' 011095. Post contact/prepared by gtaevs
Please send a copy of your response to: Commercial Section (FCS TOP),
American Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to TC0247..
(0013) Loren Data Corp. http://www.ld.com (SYN# 0449 19950117\99-0015.SOL)