|
COMMERCE BUSINESS DAILY ISSUE OF JANUARY 24,1995 PSA#1268NASA, Johnson Space Center, JD2, Houston, TX Y -- REHABILITATION OF UTILITY TUNNEL STRUCTURE AND SYSTEM SOL
9BJT07-5-4B POC Request solicitation from BD35 /Bid Board, phone
713-483-4511. Contact:BRENDA KINSEY, Tel:713-483-3690 Contracting
Officer: LUDOLPH INGWERSEN, Tel:713-483-4177 This project includes a
base bid and 2 additive alternates. The base bid involves upgrading the
tunnel fire alarm system; providing a new communications system;
replacing the electrical receptacles; upgrading the tunnel ventilation
system; upgrading and sealing the tunnel hatches; construction new
structural crossovers, exhaust vents, an/ exitways. New underground
runds of steam and condensate lines, as well as replacement of steam
and condensate lines within the tunnel and associated asbestos
insulation abatement will also be included in the project. Additive
Alternate No.1 will be the repair of several concrete cracks and
expansion joints in the tunnel floor, wall and ceiling. Additive
alternate no. 2 will be the construction of a single structural
concrete cross. The construction cost is estimated to be in the
$1,000,000 to $5,000,000 range. Period of construction is 550 calendar
days. SIC code 1542. Open to large and small businesses._A MANDATORY
WALK-THRU IS REQUIRED FOR ALL PROPOSED GENERAL CONTRACTORS. (0020) Loren Data Corp. http://www.ld.com (SYN# 0089 19950123\Y-0006.SOL)
Y - Construction of Structures and Facilities Index Page
|
|