COMMERCE BUSINESS DAILY ISSUE OF JANUARY 26,1995 PSA#1270Kotaro Hashimoto, Director-General, Kinki Regional Construction Bureau
(Moc), 1-5-44 Otemae, Chuo-Ku, Osaka-Shi 540 99 -- JAPAN: SOL KENSETSU KOGYO SHIMBUN: 01/12/95 PG. 14. DUE 130095
POC Tel 81/6/942-1141 S16 Construction of the otsu flood control open
channel opening time and date 13:00, mar. 16, 1995. Open 1)
Construction Title Construction of the otsu flood control open channel;
2) site 1-chome-chisaki ishiyamadera, otsu-Shi, shiga-ken; 3) summary
a) overall work Construction length 211.6 meters; open channel of 12 to
24 meters width, 10 4 meters height, 34 6 meters length; stilling
channel of 12 meters width, 15 08 meters height, 45.0 meters length;
underground channel of 12 meters width, 8 meters height, 132 meters
length, including 72 meters' use of the main structure of continuous
underground Walls; one set of temporary work - temporary
earth-retaining work 458 5 meters, using soil- mixing and reinforced
concrete continuous underground Walls; Construction of national road
detour 250 0 meters; and B) work at this time Construction length 211.6
meters; earth-retaining work (continuous underground Walls) 458 5
meters - soil-mixing continuous underground Walls of 15 5 to 26 meters
depth and 314 meters length, reinforced concrete continuous
underground Walls of 18 meters depth and 144 0 meters; Construction of
national road detour 272 5 meters; 4) Construction period: approx 24
months; 5) main materials to be used: 3,340 cubic meters of concrete,
570 tons of reinforcing steel, 1,950 tons of H steel beams; 6) deadline
for submission of application forms/related documents for qualification
screening 16:30, jan. 25, 1995; 7) contact for tender documents
contract Division, Kinki Regional Construction Bureau, Ministry of
Construction, 1-5-44 Otemae, Chuo-Ku, Osaka-Shi 540 12 eligible tender
participants: 1) firms that Do not fall under articles 70 and 71 of
the cabinet order concerning budget, auditing, and accounting; 2) firms
Qualified for open competitive tendering on Public works by the Kinki
Regional Construction Bureau; 3) firms that score 1,000 points Or more
in a formula calculated from bidding company's objective criteria at
the time of application for qualification; 4) firms not undergoing
bankruptcy procedures; 5) firms that have -- since 1989 as the main
contractor -- actually carried out and completed Construction of
underground continuous Walls of at least 20 meters depth note: Only
Construction Projects in which bidder has had a 30 percent Or greater
share are eligible por consideration; 6) firms that can assign to the
Construction site a full-time chief engineer Or engineering supervisor
who meets the following criteria a) is Qualified as a certified
first-class Construction supervisor Or equivalent Or higher; B) has --
since 1984 as the main contractor -- had similar Construction
experience; and C) in the case of engineering supervisor, is Qualified
to supervise designated Construction works; 7) firms not currently
suspended from designation by the Director of the Kinki Regional
Construction Bureau; and 8) firms not related by capital Or personnel
to the contractors involved in this project bid documents must be
obtained directly from the submitting Agency, not from U S. Embassy.
Date of publication in ''kensetsu kogyo shimbun'' 011295. Please send
a copy of your response to: Commercial Section (FCS TOP), American
Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to TC0265.. (0024) Loren Data Corp. http://www.ld.com (SYN# 0466 19950125\99-0001.SOL)