COMMERCE BUSINESS DAILY ISSUE OF JANUARY 27,1995 PSA#1271US Army Engineer District, Fort Worth, P.O. Box 17300, 819 Taylor
Street, Room 13A42, Fort Worth, TX 76102-0300 M -- SAN ANTONIO RIVER TUNNEL, UNIT 8-5-1 PHASE IV PART II, SAN
ANTOINO OUTLET STRUCTURES SOL DACW63-95-B-0046 DUE 031495 POC NIANNE
MOHLSTROM, CONTRACT SPECIALIST, 817/334-2132. **CORRECTION** This
action was originally published in the (CBD) 19 JAN 95. In item #17 of
the notice, please note the following corrections. All notices printed
should read as follows: Estimated Cost Range: $5,000,000.00 to
$10,000,000.00. Bid sets available at $88.75 for Half size and $201.75
for Full size. Duration of contract is 550 calendar days. If a large
business firm is selected for this announcement, it must comply with
FAR 52.219-9 clause regarding the requirements for subcontracting plan
on that work it intends to subcontract. The Fort Worth District goal
of the total dollars to be contracted is for 60.3% to go to Small
Business; of the 60.3% goal, 9.8% should go to Small Disadvantaged
Business; and 2.9% should go to Women Owned Small Business. The plan is
not required as part of this submittal. The plan will be due five days
after written responsible sources will be considered. All other
information in the original synopsis is correct. (0025) Loren Data Corp. http://www.ld.com (SYN# 0079 19950126\M-0001.SOL)