|
COMMERCE BUSINESS DAILY ISSUE OF JANUARY 27,1995 PSA#1271USDA, Flathead National Forest, 1935 Third Avenue East, Kalispell, MT
59901 Y -- HYDROELECTRIC PLANT CONTROLS Sol IFB R1-10-95-8 due 031695.
Contact Point, Barb Venturini/Nola Rice, 406/758-5318, 406/758-5310.
The Flathead National Forest will be advertising an Invitation for Bids
for the replacement of the Hydroelectric Plant Controls, Spotted Bear
Ranger District, Flathead County, Montana. The project consists of
replacing the existing control electronics (Fault Shutdown, Ballast
Control, and Digital Panel Meter) with a Programmable Logic Controller
(PLC). The new PLC will provide start up/shut down sequences and will
monitor and control power output from an existing 50 KW KATO
generator/water turbine system. Work also includes replacing an
existing 10-inch motorized gate valve with an electronically-controlled
butterfly valve. The existing water tank ballast will be replaced with
an air-cooled load bank. Issue date, approximately February 15, 1995.
Contract time, 30 calendar days from the effective date of the Notice
to Proceed estimated to be issued May 1, 1995. THIS PROJECT IS
DEPENDENT UPON AVAILABILITY OF FUNDS. The Government price estimate
range is between $25,000 and $100,000. See Numbered Note 3. (024) Loren Data Corp. http://www.ld.com (SYN# 0153 19950126\Y-0010.SOL)
Y - Construction of Structures and Facilities Index Page
|
|