|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 2,1995 PSA#1275Sadanori Amano, Director-General, Kanto Regional Bureau of Postal
Services (Mpt), 2-3-2 Otemachi, Chiyoda-Ku, Tokyo 100-96 99 -- JAPAN: SOL KENSETSU KOGYO SHIMBUN: 01/27/95 PG. 5. DUE 103095
POC Tel 81/3/3243-4524 S1542 Construction of Post Office building
opening time and date 10:30, mar. 24, 1995. Open 1) Construction Title
Construction of miyamae Post Office (tentative name) building; 2) site
4-1-1 arima, miyamae-Ku, kawasaki-Shi, kanagawa-ken; 3) summary a) site
area 5,644 01 square meters; B) structure: reinforced concrete
Construction, four stories above ground, one story below ground; C)
size land area 3,193 55 square meters, total floor area 13,038.55
8QUARE meters; D) use for Post Office facility; and e) work: General
contract of building; 4) Construction period approx 20 months; 5) main
materials to be used: approx. 9,430 square meters, approx 1,050 tons
of reinforcing steel; 6) deadline for submission of application
forms/related documents for qualification screening 15 00, feb. 6,
1995; 7) contact for tender documents: General Affairs Division,
building department, Kanto Regional Bureau of Postal Services, ministry
of posts and telecommunications, 2-3-2 Otemachi, Chiyoda-Ku, Tokyo
100-96 eligible tender participants 1) designated consortia comprised
of firms that meet the following criteria a) firms that do not fall
under articles 70 and 71 of the cabinet order concerning budget,
auditing and accounting; B) firms grade ''a''-qualified for opbn
competitive tendering on Construction works by the Kanto Regional
Bureau of Postal Services for goj fy 93/94; C) firms that have -- since
1989 as the main contractor -- actually carried out Construction of a
Post Office building, government building, or Office building with at
least one story below ground and at least 6, 500 square meters total
floor area note: only Construction Projects in which the bidder has had
a 30 percent or greater share are eligible for consideration; D) firms
that can assign to the Construction site a full-time chief engineer
nationally licensed for Construction works under the Construction
business law, excluding the representative firm of a consortium; e)
firms not currently suspended from designation by the ministry of posts
and telecommunications in the District of the Kanto Regional Bureau of
Postal Services; and F) firms not related by capital or personnel to
the contractors involved in this Project; 2) the representative firm of
a consortium must meet the following criteria a) ha8 -- since 1989 as
the main contractor -- actually carried out Construction of a Post
Office building or government building primarily made of reinforced
concrete, at least one story below ground and at least 10,000 square
meters total floor area note: in the case of consortium Project, only
Construction Projects in which the bidder has participated as its
representative are eligible for consideration; B) can assign to the
Construction site a full-time chief engineer or Construction supervisor
who meets the following criteria (1) is qualified as a cbrtified
First-class Construction supervisor under the Construction business law
or as a certified First-class architect under the architects law; (2)
has -- as chief engineer or engineering supervisor -- at least one year
of Construction experience as described in item 1) - C) above, or has
since 1989 had at least one year of similar experience in the case of
a person who lacks experience of chief engineer or engineering
supervisor; and (3) in the case of Construction supervisor, is
qualified to supervise designated Construction works; C) number of
member firms in a consortium three firms; D) method of organization to
be voluntarily organized; e) participation ratio every consortium
member must have at least six tenths of an equally divided share of
involvement; F) the representative firm of a consortium must have the
greatest share of involvement; G) a bidding consortium is valid only
from its designation to the datb of approval by the procurer after
delivery of the completed Project, and for consortia other than the
winner, from their designation to the time of signing of this contract;
H) Title of a consortium ''cons0RTIUM for new Construction of miyamae
Post Office (tentative name) building''; and I) method of agreement of
a consortium to be conducted by the style of ''consortium agreement,''
as separately specified bid documents must be obtained directly from
the submitting agency, not from U S. Embassy date of publication in
''kensetsu kogyo shimbun'' 012795. Post contact/prepared by gtaevs
Please send a copy of your response to: Commercial Section (FCS TOP),
American Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to TC0287..
(0031) Loren Data Corp. http://www.ld.com (SYN# 0423 19950201\99-0001.SOL)
99 - Miscellaneous Index Page
|
|