COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 2,1995 PSA#1275Koji Moto, Director-General, First District Port Construction Bureau
(Mot), 1-332 Hakusan-Ura, Niigata-Shi 951 99 -- JAPAN: SOL KENSETSU KOGYO SHIMBUN: 01/27/95 PG. 5. DUE 140095
POC Tel 81/25/265-7777 S1622 Construction of tunnel opening time and
date: 14:00, mar. 16, 1995. Open 1) Construction Title Construction of
a tunnel on the ground of the right Bank for the Niigata Port highway
tunnel in nishiko area; 2) site rinkai-chinai, Niigata- Shi; 3)
summary excavation approx. Lg,000 cubic meters, waterproofing approx
3,900 square meters, shore struts/wales approx 600 tons, main structure
approx. 40 meters length, measurement work; 4) Construction period
approx 12 months; 5) main materials to be used: approx. 4,500 cubic
meters of concrete, approx B00 tons of reinforcing steel, approx 600
tons of steel beams for shore struts and wales; 6) deadline for
submission of application forms/related documents for qualification
screening feb. 8, 1995; 7) contact for tender documents supplies
division, First District Port Construction Bureau, 1-332 Hakusan-Ura,
Niigata-Shi 951 eligible tender participants 1) firms that do not fall
under articles 70 and 71 of the cabinet order concerning budget,
auditing, and accounting; 2) firms qualified for open competitive
tendering on Port and airport Public works by the First District Port
Construction Bureau; 3) firms that score 1,000 points or more in civil
engineering work and 800 points or more in General Public works in a
formula calculated from bidding company's objective criteria at the
time of application for qualification; 4) firms that have -- since 1989
as the main contractor -- actually carried out installation of a
concrete structure made of at least 3,000 square meters of concrete in
the underground of at least eight meters excavation and measurement
control on pore water pressure, submersion, and stress; 5) firms that
can assign to the Construction site a full-time chief engineer or
engineering supervisor who meets the following criteria a) is qualified
as a certified First-class Construction supervisor or certified
engineer in Construction; B) has since 1989 had Construction experience
as described in item (4) above; and C) in the case of engineering
supervisor, is qualified to supervise designated Construction works; 6)
firms not related by capital or personnel to the contractors involved
in this Project; and 7) firms not currently suspended from designation
by the Director of the First District Port Construction Bureau bid
documents must be obtained directly from the submitting agency, not
from U S. Embassy date of publication in ''kensetsu kogyo shimbun''
012795. Post contact/prepared by gtaevs Please send a copy of your
response to: Commercial Section (FCS TOP), American Embassy, Tokyo,
Unit 45004, APO Ap 96337, Refer to TC0290.. (0031) Loren Data Corp. http://www.ld.com (SYN# 0427 19950201\99-0005.SOL)
99 - Miscellaneous Index Page
|
|