Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 6,1995 PSA#1277

Commander, Pacific Division, Naval Facilities Engineering Command, Contracts Department, Building 258, Pearl Harbor, HI 96860-7300 (Code 0211)

C -- ARCHITECT-ENGINEER SERVICES FOR FY97 NAVY FAMILY HOUSING PROJECT HC/R 05-93, WHOLEHOUSE REVITALIZATION, NCTAMS WESTPAC, DILLINGHAM HOUSING, PUBLIC WORKS CENTER, GUAM SOL N62742-95-R-4500 POC Contact Ms. Donna Matsuura, Contract Specialist, (808) 474-6321 Services include, but are not limited to design and engineering services for FY97 Navy Family Housing Project HC/R 05-93, Wholehouse Revitalization, NCTAMS WESTPAC, Dillingham Housing, Public Works Center, Guam. The project will provide repairs and improvements to 64 Dillingham-type enlisted family housing units in NCTAMS WESTPAC housing area. The repairs will replace floor finishes, kitchen base and wall hung cabinets, storage shelves, gypsum board wall, windows with tinted glass, bathroom floor and wall finishes, tinted glass, bathroom floor and wall finishes, kitchen sink including faucets and fittings, garbage disposal, dishwasher, water heater, plumbing fixtures, toilet accessories, exhaust fans, wiring devices, smoke detector, telephone and CATV pull boxes, aluminum conduit and incandescent with fluorescent lights. Construct covered patio with privacy wall, brick veneer entry facing, renovate carport to include exterior storage with trash enclosure, install additional shower/vanity in master bathroom, range hood, range backplate and fire protection system, related electrical work. Design shall be done in metric. Scope includes asbestos removal, clean-up and disposal of debris. If asbestos or hazardous materials exist, the Architect-Engineer (A-E) contractor shall identify them and provide for their disposal in the construction plans and specifications in accordance with applicable rules and regulations pertaining to such hazardous materials. The selected A-E may be required to participate in a pre-fee meeting within seven days of notification and provide a fee proposal within ten days of the meeting. Initial design and engineering services include preparation of cost certification and/or project engineering documents. Follow-on phases may include the preparation of preliminary design documents, preparation of final design, post-construction award services; construction surveillance and inspection services; operational and maintenance support information services. Estimated construction cost $5,000,000.00 to $10,000,000.00. Estimated start and completion dates are July 1995 and May 1996, respectively, including review periods. Selections may be subject to an advisory audit performed by the Defense Contract Audit Agency. The following selection evaluation criteria, in relative order of importance, will be used in the evaluation of A-E firms: (1) Professional qualifications of firm and staff proposed in designing family housing renovations, repairs or improvement, and designing in tropical environments similar to Guam. (2) Specialized recent experience and technical competence of firm or particular staff members in designing family housing renovations, repairs or improvements, and designing in tropical environments similar to Guam. (3) Capacity to accomplish the work in the required time. (4) Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. (5) A-E firm's design quality control practices/ techniques. (6) Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project. (7) The volume of work previously awarded to the firm by the Department of Defense shall also be considered, with the object of effecting an equitable distribution of Department of Defense A-E contracts among qualified A-E firms and firms that have not had Department of Defense contracts. (8) Use of Small or Small Disadvantaged or Women-owned Small Business firms shall also be considered. Subcontracting Plan is required from large business firm with proposed fee of over $500,000.00. Each firm's past performance and performance rating(s) will be reviewed during the evaluation process and can affect the selection outcome. A-E firms which meet the requirements described in this announcement are invited to submit complete, updated Standard Forms 254, Architect Engineer and Related Services Questionnaire, and 255, Architect-Engineer and Related Services Questionnaire for Specific Project, to the office shown above. A-E firms utilized by the prime A-E must also submit completed Standard Forms 254 and 255. Only one copy of each form is required. IN BLOCK 10 AND AN ADDENDUM THERETO, IF NECESSARY, STATE WHY YOUR FIRM IS SPECIALLY QUALIFIED BASED ON EACH OF THE ABOVE SELECTION EVALUATION CRITERIA. FOR SELECTION EVALUATION CRITERIA ''(2)'', PROVIDE THE FOLLOWING INFORMATION FOR ONLY THE STAFF PROPOSED FOR THIS WORK USING THESE COLUMN HEADINGS: ''NAME'', ''RELATED PROJECTS WORKED ON'', ''YEAR'', ''FIRM'', AND ''TECHNICAL ROLE''. Show the office location where work will be done and describe the experience and location of those that will do the work. Firms responding to this announcement within 30 days from publication date will be considered. Firms must submit forms to the Contracts Department by 2:00 p.m. HST, on the closing date. Should the due date fall on a weekend or holiday, Standard Forms 254 and 255 will be due the first workday thereafter. This is not a request for a proposal. See Note 24. (0033)

Loren Data Corp. http://www.ld.com (SYN# 0044 19950203\C-0009.SOL)


C - Architect and Engineering Services - Construction Index Page