|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 9,1995 PSA#1280Commanding Officer, Southwest Division, Naval Facilities Engineering
Command, Code 0211, 1220 Pacific Highway, Room 145, San Diego, CA
92132-5187 C -- A-E SERVICES AND PLANS AND SPECIFICATIONS FOR FY 1996 OASD(HA)
PROJECT P-427, ENVIRONMENTAL HEALTH/INDUSTRIAL HYGIENE FACILITY, NAVAL
HOSPITAL, MARINE CORPS BASE, CAMP PENDLETON, CALIFORNIA SOL
N68711-95-C-7567 DUE 031095 POC Chuck Benson/Contract Specialist, (619)
532-3375, Nancy J. Trent/Contracting Officer, (619) 532-2853. 17. Firm
Fixed Price. Architect-Engineer services are required for the
preparation of plans and specifications for the purpose of bidding and
construction for a 7,700 square foot, single story concrete masonry,
steel framed Environmental Health/Industrial Hygiene Testing Facility
with fire protection, physical security, and energy monitoring systems,
air conditioning, interior design, water, gas and electrical utilities,
parking and landscaping for the Naval Hospital, Camp Pendleton,
California. The estimated start date is April 1995. The estimated
completion date is November 1996. The estimated construction cost is
between $1,000,000 and $5,000,000. A-E Selection criteria will include
(in order of importance): (1) Recent specialized experience of the
firm (including consultants) in the design and construction document
preparation of environmental health and preventive medicine facilities
located in the Southern California area. Design experience is to
include medical facilities involving design procedures established by
the DOD Medical Command. Do not list more than a total of 10 projects
in block 8. Include point of contact name and telephone number in block
8c for each project listed. Indicate which consultants from the
proposed team, if any, participated in the design and construction
document preparation for each project. (2) Professional qualifications
of the staff to be assigned to this project in the design and
production of construction documents for environmental health and
preventive medicine facilities in the Southern California area
including design experience using DOD Medical Command design
procedures. List only the team members who actually will perform major
tasks under this project, qualifications should reflect the
individual's potential contributions to this project. (3) Past
performance on contracts with government agencies and private industry
in terms of cost control, quality of work and compliance with
performance schedules. Indicate by briefly describing internal quality
assurance and cost control procedures and indicate team members who
are responsible for monitoring these processes. List recent awards,
commendations and other performance evaluations (do not submit copies).
(4) Location in the general geographic area of the project and
knowledge of the locality of the project, provided that the application
of this criterion leaves an appropriate number of firms given the
nature and size of this project. (5) Capacity to accomplish the work in
the required time. Indicate the firms present workload and the
availability of the project team (including consultants) for the
specified contract performance period and indicate specialized
equipment available and prior security clearances. (6) List the small
or disadvantaged or woman- owned business firms used as primary
consultants or as subconsultants. If a large business concern is
selected for this contract, they will be required to submit a
subcontracting plan that should reflect a minimum 5% Small
Disadvantaged Business of the amount to be subcontracted out. Those
firms which meet the requirements described in this announcement and
wish to be considered, must submit one copy each of a SF 254 and a SF
255 for the firm and a SF 254 for each consultant listed in block 6 of
the firms SF 255. One copy of the submittal package is to be received
in this office no later than 3:00 P.M. Pacific Time on the due date
indicated above. Should the due date fall on a weekend or holiday, the
submittal package will be due the first workday there after.
Submittals received after this date and time will not be considered.
Additional information requested of applying firms: indicate
solicitation number in block 2b, CEC (Contractor Establishment Code)
and/or Duns number (for the address listed in block 3) and TIN number
in block 3, telefax number (if any) in block 3a and discuss why the
firm is especially qualified based on the selection criteria in block
10 of the SF 255. For firms applying with multiple offices, indicate
the office which completed each of the projects listed in block 8 and
list which office is under contract for any contracts listed in block
9. Use block 10 of the SF 255 to provide any additional information
desired. Personal interviews may not be scheduled prior to selection of
the most highly qualified firm. SF 255's shall not exceed 30 printed
pages (double sided is two pages/organizational charts and photographs
excluded, exception: photographs with text will be considered as a
page). All information must be included on the SF 255 (cover letter,
other attachments and pages in excess of the 30 page limit will not be
included in the evaluation process). Firms not providing the requested
information in the format (i.e. listing more than a total of 10
projects in block 8, not providing a brief description of the quality
control plan, not listing which office of multiple office firms
completed projects listed in block 8, etc.) directed by this synopsis
may be negatively evaluated under selection criteria (3). Firms which
design or prepare specifications for a construction contract or
procurement of supplies cannot provide the construction or supplies.
This limitation also applies to subsidiaries and affiliates of the
firm. This is not a request for proposal. Telegraphic and facsimile SF
255's will not be accepted. Site visits will not be arranged during
the submittal period. See Numbered Note(s): 24. (0038) Loren Data Corp. http://www.ld.com (SYN# 0037 19950208\C-0009.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|