36109-0715 Y -- CONSTRUCT AIRCRAFT PARKING APRON AND HYDRANT REFUELING SYSTEM,
BIRMINGHAM INTERNATIONAL AIRPORT (ANG), BIRMINGHAM, AL Sol. DAHA01 95
B 0002. POC: MSgt Lanier, (334) 213-7515, Contract Specialist. Project
consists of furnishing all labor, materials and equipment required to
perform all work in strict accordance with specifications, schedules,
and drawings for the construction of a Parking Apron and Hydrant
Refueling System for KC 135 Aircraft, complete and ready for use. A
general description of the work includes the following: concrete
culvert, storm sewers, and miscellaneous utilities. Construct a new
55,171 square yard concrete parking apron; a new 7,785 square yard
Taxiway F with asphalt; construct a 3,418 square yard of concrete ramps
to the Fuel Cell Dock and Maintenance Hanger; storm sewer culvert
relocation system; POL operations area site work; two refueling truck
parking areas; a hydrant refueling system complete consisting of one
2,500 BBB aboveground steel tank, with concrete dike walls and
containment paving; approximately 6,900 LF of 10'' double wall
underground hydrant loop piping with interstitial leak detection and
protection; a hydrant system pump shelter complete with an AFFF Storage
Room and Control Room; a 6,000 gallon double wall underground product
recovery tank, and incidental work and appurtenances required to
provide a complete and useable hydrant system. Construct an additional
22,817 square yard concrete parking apron with blast fence, lights, a
1,492 square yard widening of Taxiway ``F'', an emergency catch basin;
two (2) prefabricated hydrant pits complte with riser stacks and
control valves, for two prefabricated hydrant pits installed under the
Base Bid. Construct second 2,500 BBL tank, concrete dike walls and
containment paving complete with incidental related work and
appurtenances, and a complete fuel spill recovery system. Construct AGE
parking lot and apron access road, and additional paved shoulders
adjacent to Taxiway H and the north perimeter of the parking apron.
Install fencing around AGE area. Install pump shelter over existing
pump pad. Estimated cost of construction is more than $10,000,000.00.
A non-refundable check of $175.00 made payable to the A&FO, Tyndall
AFB, FL is required for each set of plans and specifications. Plans,
specification and bid documents are available from the USPFO for
Alabama, ATTN; AL-US-P, P.O. Box 3715, Montgomery, AL 36109-0715. Plans
and specifications will be available for reviewing at the F.W. Dodge
Plans Room, Birimingham, AL, the Alabama Builders Exchange, Birmingham,
AL, Construction Market Data (CMD), Birmingham, AL, and the office of
the Base Civil Engineer, Birmingham International Airport (ANG),
Brimingham, AL. This projet is 100% unrestricted. IFB Number DAHA01 95
B 0002 will be issued with an anticipated issue date of February 25,
1995 with Bid Opening on or about March 30, 1995. (037) Loren Data Corp. http://www.ld.com (SYN# 0156 19950208\Y-0005.SOL)
Y - Construction of Structures and Facilities Index Page
|
|