Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 13,1995 PSA#1282

Yoshihiro Ichikawa, Director-General, Tokyo First Construction Bureau (Japan Highway Public, Corporation), 1-18-1 Toranomon, Minato-Ku, Tokyo 105

99 -- JAPAN: SOL KENSETSU KOGYO SHIMBUN: 02/07/85 PG. 5. DUE 110095 POC Tel 81/3/3502-7431 S1611 reconstruction of expressway opening time and date 11:00, mar. 24, 1995 open 1) Construction Title reconstruction of kanuma Section on the tohoku expressway; 2) Construction site from aza-kyokuse, moro to aza-machida, shirokuwata, kanuma- Shi, tochigi-ken; 3) work summary Construction of a Highway (extension from four-lane to six-lane) of 2,740 meters in length (earth work volume approx 60,000 cubic meters), including substructure work for a bridge (at three sites, 72 meters in length), and superstructure and substructure work for a bridge (at one site, 36 meters in length); total length 2,740 meters; width: Highway portion 3 5 meters X 2, bridge portion 3.5 meters X 2; earth work volume approx 60,000 cubic meters; bridge: superstructure and substructure work at one site - 36 meters, substructure work only at three sites - 72 meters, 8 abutments; foundation work concrete compaction piles (1 0 meter in diameter, 210 meters in length); and cross structure culvert boxes at seven sites, culvert pipes at six sites; communication facility, etc at one site; 4) Construction period 900 days; 5) main materials to be used approx. 5,980 cubic meters of concrete, approx 460 tons of reinforcing steel, approx. 1,110 tons of asphalt compounds, approx 730 meters of guard rail; 6) deadline for submission of application forms/related documents for the qualification screening 16 00, feb. 17, 1995; 7) contact for Tender documents: Contract Division, Procurement and right-of-way Department, Tokyo First Construction Bureau, Japan Highway Public Corporation, 1-18-1 Toranomon, Minato-Ku, Tokyo 105 qualifications for Tender participants 1) those who do not come under article 4 of the Japan Highway Public Corporation's Contract agreement no 3; 2) those who are qualified by Tokyo First Construction Bureau for open competitive tendering on Highway Construction work, or a consortium comprised of two qualified contractors for goj fy '94/'95; 3) those who have, since 1988 as the main contractor, actually carried out Construction of Highway at least 1 0 kilometer in length. Note: in a consortium, only Construction Projects where the bidder has had a 30% or greater share are eligible for review, and all consortium member companies must have similar Construction records; 4) those who can place at the Construction site a field representative or a Chief Engineer (supervisor) who possesses, since 1988, such experience as described in item (3) above; 5) those who are not under suspension from designation by Japan Highway Public Corporation in area 3; 6) for a consortium, each member company must satisfy the following conditions (except for those who are pre- screened on Management operations by the Construction minister) a) possesses five years or more of business operation in the type of Construction work qualified under the contractors law; B) can place at the Construction site a qualified Construction supervisor or a nationally-licensed Chief Engineer on a full-time basis; and C) has a 30% or greater of involvement, with the representative company having the greatest share; and 7) those Construction companies which are not related by capital or personnel to the contractors involved in this Project bid documents must be obtained directly from the submitting Agency, not from U S. Embassy. Date of publication in ''kensetsu kogyo shimbun'' 020795. Post contact/prepared by gloose Please send a copy of your response to: response to:, Commercial Section (FCS TOP), American Embassy, Tokyo, Unit 45004, APO Ap 96337, Refer to TC0300.. (0040)

Loren Data Corp. http://www.ld.com (SYN# 0420 19950210\99-0005.SOL)


99 - Miscellaneous Index Page