COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 13,1995 PSA#1282Yoshihiro Ichikawa, Director-General, Tokyo First Construction Bureau
(Japan Highway Public, Corporation), 1-18-1 Toranomon, Minato-Ku, Tokyo
105 99 -- JAPAN: SOL KENSETSU KOGYO SHIMBUN: 02/07/85 PG. 5. DUE 110095
POC Tel 81/3/3502-7431 S1611 reconstruction of expressway opening time
and date 11:00, mar. 24, 1995 open 1) Construction Title
reconstruction of kanuma Section on the tohoku expressway; 2)
Construction site from aza-kyokuse, moro to aza-machida, shirokuwata,
kanuma- Shi, tochigi-ken; 3) work summary Construction of a Highway
(extension from four-lane to six-lane) of 2,740 meters in length (earth
work volume approx 60,000 cubic meters), including substructure work
for a bridge (at three sites, 72 meters in length), and superstructure
and substructure work for a bridge (at one site, 36 meters in length);
total length 2,740 meters; width: Highway portion 3 5 meters X 2,
bridge portion 3.5 meters X 2; earth work volume approx 60,000 cubic
meters; bridge: superstructure and substructure work at one site - 36
meters, substructure work only at three sites - 72 meters, 8 abutments;
foundation work concrete compaction piles (1 0 meter in diameter, 210
meters in length); and cross structure culvert boxes at seven sites,
culvert pipes at six sites; communication facility, etc at one site; 4)
Construction period 900 days; 5) main materials to be used approx.
5,980 cubic meters of concrete, approx 460 tons of reinforcing steel,
approx. 1,110 tons of asphalt compounds, approx 730 meters of guard
rail; 6) deadline for submission of application forms/related documents
for the qualification screening 16 00, feb. 17, 1995; 7) contact for
Tender documents: Contract Division, Procurement and right-of-way
Department, Tokyo First Construction Bureau, Japan Highway Public
Corporation, 1-18-1 Toranomon, Minato-Ku, Tokyo 105 qualifications for
Tender participants 1) those who do not come under article 4 of the
Japan Highway Public Corporation's Contract agreement no 3; 2) those
who are qualified by Tokyo First Construction Bureau for open
competitive tendering on Highway Construction work, or a consortium
comprised of two qualified contractors for goj fy '94/'95; 3) those who
have, since 1988 as the main contractor, actually carried out
Construction of Highway at least 1 0 kilometer in length. Note: in a
consortium, only Construction Projects where the bidder has had a 30%
or greater share are eligible for review, and all consortium member
companies must have similar Construction records; 4) those who can
place at the Construction site a field representative or a Chief
Engineer (supervisor) who possesses, since 1988, such experience as
described in item (3) above; 5) those who are not under suspension from
designation by Japan Highway Public Corporation in area 3; 6) for a
consortium, each member company must satisfy the following conditions
(except for those who are pre- screened on Management operations by the
Construction minister) a) possesses five years or more of business
operation in the type of Construction work qualified under the
contractors law; B) can place at the Construction site a qualified
Construction supervisor or a nationally-licensed Chief Engineer on a
full-time basis; and C) has a 30% or greater of involvement, with the
representative company having the greatest share; and 7) those
Construction companies which are not related by capital or personnel to
the contractors involved in this Project bid documents must be obtained
directly from the submitting Agency, not from U S. Embassy. Date of
publication in ''kensetsu kogyo shimbun'' 020795. Post contact/prepared
by gloose Please send a copy of your response to: response to:,
Commercial Section (FCS TOP), American Embassy, Tokyo, Unit 45004, APO
Ap 96337, Refer to TC0300.. (0040) Loren Data Corp. http://www.ld.com (SYN# 0420 19950210\99-0005.SOL)