COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 23,1995 PSA#1289U. S. Army Corps of Engineers, Omaha District, 215 North 17th Street,
Omaha, NE 68102-4978 C -- POTENTIAL FIXED-PRICE CONTRACTS FOR DESIGN OF
BARRACKS/DORMATORIES AND MILITARY FAMILY HOUSING IN THE OMAHA DISTRICT
SOL DACA45-95-R-0035 POC For further information, Contact John M.
Miller at: (402) 221-4176. This amendment makes the following changes
to the original solicitation which appeared in the CBD issue of
February 16, 1995: (1) Delete the CONTRACT INFORMATION section and
substitute the following: CONTRACT INFORMATION: A-E services are
expected to be required for the design of this type of project within
the Omaha District. Services required may include site investigations,
studies, reports, concept design, final design, and construction phase
services. A separate firm-fixed-price contract will be negotiated for
each project. A list of most highly qualified and technically equal
firms for this type of project will be established based on evaluation
criteria (a) through (c). When a project of this type is authorized,
the list will be ranked in order of qualifications based on evaluation
criteria (c) through (g) and negotiations will begin with the top
ranked firm. Firms awarded contracts under this solicitation will not
be considered for ranking again until all firms on the list of most
qualified firms have been offered contracts. Firms will be selected for
this type project from the list established under this solicitation for
the next 12 months. No projects of this type are currently authorized
for design and funds are not presently available for any contracts (see
FAR 52.232-18). The Omaha District may establish a design partnership
for any projects awarded under this solicitation. If a design
partnership is to be established, the A-E will attend a one-day
partnering meeting prior to negotiation to define Omaha District
expectations of the A-E, create a positive working atmosphere,
encourage open communication and identify common goals. Greater
emphasis will also be placed on the A-E's quality control proceedures.
The District will not review Quality into the design. The A-E selected
for an individual project under this solicitation must submit for
approval a project-specific design quality control plan as a condition
of contract award. This plan is not required with this submittal. If
a large business is selected for a project under this solicitation, it
must comply with FAR 52.219-9 regarding the requirement for a
subcontracting plan on that part of the work it intends to contract.
This plan is not required with this submittal. The subcontracting goals
for this contract are that a minimum of 28% of the contractor's
intended subcontract amount be placed with small businesses (SB),
including small disadvantaged businesses (SDB), and 8% be placed with
SDB. (2) In PROJECT INFORMATION section of the original solicitation,
delete the last sentence and substitute the following: The estimated
construction cost of projects will be between $10,000,000 and
$20,000,000 or $20,000,000 and $40,000,000. Firms will be considered
for the most qualified firm list based on capacity to complete a
project in the lower range. Firms will be ranked based on capacity to
complete a specific project within the construction cost range
applicable to that project. (3) Delete item (e) in the SELECTION
CRITERIA section of the original solicitation and substitute the
following: (e) Location and knowledge of the locality of the project.
(4) All other information remains unchanged, including the closing date
of March 20, 1995. (0052) Loren Data Corp. http://www.ld.com (SYN# 0027 19950222\C-0006.SOL)
C - Architect and Engineering Services - Construction Index Page
|
|