Loren Data Corp.

'

 
 

COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 23,1995 PSA#1289

Ecology and Environment, Inc., 111 West Jackson Blvd., Chicago, IL 60604

Y -- DECONTAMINATE ABOVE/UNDERGROUND TANKS/EQUIPMENT VAULTS, DEMOLISH ABOVEGROUND TANKS; INSTALL GROUNDWATER/NAPL EXTRACTION SYSTEM; CONSTRUCT GROUNDWATER TREATMENT SYSTEM/BUILDING SOL ZI6083. POC Project Manager, Benjamin L. Horeziak, PE, 312/663-9415. Pre-solicitation notice for services for a US EPA Superfund project under contract No. 68-W8-0086 involving hazardous wastes associated with a former pentachlorophenol wood treating facility in New Brighton, Minnesota. The project implements an Interim Remedial Action at the MacGillis and Gibbs/Bell Lumber and Pole Superfund dite. This acion requires the removal of liquids and sludges fom 10 ASTs, 8 USTs, and 3 underground equipment vaults (vaults), the decontamination of ASTs, USTs and vaults, the demolition of the ASTs, one extraction well, a groundwater extraction system, a non-aqueous phase liquid extraction system, waste disposal, groundwater treatment system and discharge pressure main. Construction is anticipated to be completed within 6 months of NTP and O&M is to continue for 1 year. This description of the work to be performed is not intended to be all encompassing for the total project. A full description of the work to be completed is included in the detailed plans and specifications (design sets) available from the above stated address. Interested parties may obtain copies of design sets upon payment of $100 in check or money order, in U.S. funds drawn upon a U.S. bak for each complete set. Cash will not be accepted. Request for design sets should be sent to the project manager, however, design sets will not be sent until March 15, 1995. Bids will be due approximately 30 days after March 15, 1995. Prospective bidders are advised of the following conditions: 1) Personnel performing work on the site will require medical monitoring and safety training in compliance with 29 CFR 1910.120. 2) Site access is restricted. 3) A pre-bid conference and site inspection will be scheduled approximately one week after formal announcement of a Request for Bids is published in the CBD and design sets are sent to interested parties. 4) A statement of safety training and medical fitness in compliance with 29 CFR 1910.120 is required from all parties prior to entering upon the site for any purpose. 5) All requests for information must be writing. A formal respone to inquiries will be sent to interested parties receiving design sets. (048)

Loren Data Corp. http://www.ld.com (SYN# 0168 19950222\Y-0003.SOL)


Y - Construction of Structures and Facilities Index Page