COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 24,1995 PSA#1290Atlantic Division, Naval Facilities Engineering Command, 1510 Gilbert
Street, Norfolk, Virginia 23511-2699 (Attention: Code 02231) C -- ARCHITECTURAL-ENGINEERING SERVICES FOR MILCON PROJECTS FOR
AIRCRAFT FUEL STORAGE/HYDRANT FUELING SYSTEMS AT MORON AIR BASE, SPAIN
AND U. S. NAVAL AIR STATION, SIGONELLA, ITALY SOL N62470-95-R-9010 POC
Contact Miss Bayla Mack, 804-444-9676/Mr. Dean Koepp, Head, Contract
Support Branch, 804-444-9582 Architect-Engineer or Engineering Services
are required for preparation of cost certification documents,
Parametric Estimating and Programming (PEP) (a PEP is preliminary
design to the 15% level supported by full site work and related
engineeringservices), plans, specifications, cost estimates, related
studies, and all associated engineering services. Options will be
established for final design, shop drawing review, as-built drawing
preparation, construction inspection services, and thepreparation of
Operation and Maintenance Support Information (OMSI). The work includes
the first and second phases of a project to replace fuel storage and
provide a hydrant fueling system at Moron Air Base, Spain. Phase I of
this Project includes two32,000 barrel fuel storage tanks, pumping
facilities, filter/manifold building, 16 each hydrant pits, ready fuel
supply and return distribution, cathodic protection, splinter
protected, and related airfield pavement and utility connectivity.
Phase IIof this Project at Moron Air Base includes the identical scope
to Phase I at an adjacent location, plus transportation fuel pipeline
connectivity and demolition of the existing depot fuel storage at this
Base. An operationally related project at the U.S. Naval Air Station,
Sigonella, Italy may be added to this contract consisting of pumping
and filter/manifolding facilities, 4 hydrants, ready fuel supply and
return distribution, cathodic protection and related airfield pavement
and utilityconnectivity. The final design for the first projects,
Phase I at Moron Air Base and NAS Sigonella, will be required by July
1996; Phase II at Moron Air Base design completion will be required by
July 1997. Post Construction Award Services (PCAS)should be completed
by 2001. Firms are required to prepare the cost estimate utilizing the
computerized CES, the specifications in the SPECSINTACT system format,
and all drawings shall be submitted in an AutoCAD compatible format,
either DXF or .DWG,on DOS high density floppy disks. The design
contract scope may require evaluation and definition of asbestos
materials and toxic waste disposition. Fee negotiations would provide
for laboratory testing and subsequent preparation of plans
andspecifications may require definition of removal and/or definition
of disposal process. Firms responding to this announcement must be
prepared to accept the aforementioned as a part of their contract
responsibility. The A&E must demonstrate his andeach key consultant's
qualifications with respect to the published evaluation factors for all
services. Evaluation factors (1) through (5) are of equal importance;
factors (6), (7) and (8) are of lesser importance. Specific evaluation
factors include: (1) Specialized Experience - Firms will be evaluated
in terms of: (a) their past experience with regard to the design of
aircraft fueling facilities utilizing USAFE/NATO standards/criteria;
(b) their knowledge of petroleum (NAVFAC Design Manual DM-22,Petroleum
Fuel Facilities), thermodynamics, electrical, seismic design criteria
and standards, and codes, laws, permits and construction materials and
practices in Europe with specific emphasis on Italian building code;
and (c) their past experiencewith regard to aircraft refueling systems
utilizing Air Force Type III and Type IV criteria; (2) Professional
qualifications and technical competence in the type of work required:
Firms will be evaluated in terms of the design staff's: (a)professional
registration; (b) experience (with present and other firms) and roles
of staff members specifically on projects addressed in evaluation
factor number one; (c) capability to provide qualified backup staffing
for key personnel to ensurecontinuity of services; and (d)
organization and office management as evidenced by management approach
(management plan for this project), and personnel roles in
organization; (3) Ability to perform work to schedules - Firms will be
evaluated in termsof impact of this workload on the design staff's
projected workload during the design period; (4) Past Performance -
Firms will be evaluated in terms of (with emphasis on projects
addressed in factor number one): (a) cost control techniques employed
bythe firm as demonstrated by the ability to establish an accurate
project budget and design to this budget as evidenced by the low bid
amount; (b) the firm's quality of work as demonstrated by the history
of design related change orders issued duringconstruction; and (c)
demonstrated long term business relationships and repeat business with
Government and private customers, and performance awards/letters of
recommendations received; (5) Quality Control Program - Firms will be
evaluated on theacceptability of their internal quality control program
used to ensure technical accuracy and discipline coordination of plans
and specifications; (6) Firm location in locality of the contract
(Spain and Italy) (provided that application of thiscriterion leaves an
appropriate number of qualified firms, given the nature and size of the
contract) - Firms will be evaluated on their location with respect to
the general geographical area of the contract; (7) Volume of Work -
Firms will be evaluatedin terms of work previously awarded to the firm
by DOD with the objective of affecting an equitable distribution of
DOD A&E contracts among qualified A&E firms, including small and small
disadvantaged business firms and firms that have not had prior
DODcontracts; and (8) Small Business and Small Disadvantaged Business
Subcontracting Plan - Firms will be evaluated on the extent to which
offerors identify and commit to small business and to small
disadvantaged business, historically black college anduniversity, or
minority institution in performance of the contract, whether as joint
venture, teaming arrangement, or subcontractor. Estimated construction
cost for all work is between $24,000,000 - $27,000,000. Type of
contract: Firm Fixed Price.Estimated start date is June 1995. Section
114 of the General Provisions of the annual U. S. Military
Appropriations Bill requires that this contract can only be awarded to
a U. S. firm or a U. S. firm in a joint venture with a host
countryfirm.--Architect-Engineer firms which meet the requirements
described in this announcement are invited to submit completed Standard
Forms (SF) 254 (unless already on file) and 255, U. S. Government
Architect-Engineer Qualifications, to the office shownabove. In Block
10 of the SF 255, discuss why the firm is especially qualified based
upon synopsized evaluation factors; and provide evidence that your firm
is permitted by law to practice the professions of architecture or
engineering, i.e., Stateregistration number. For selection evaluation
factor (1), provide the following information for only the staff
proposed for this work using these column headings: ''NAME'', ''RELATED
PROJECTS WORKED ON'', ''YEAR'', ''FIRM'', and ''TECHNICAL ROLE''. Use
Block10 of the SF 255 to provide any additional information desired and
continue Block 10 narrative discussion on plain bond paper. All
information must be included within the SF 255 (limited to 30 pages
(front and back considered 1 page)--not less than 10point font; every
page that is not an SF 254 will be included in the 30 page count);
cover letter and other attachments will not be considered in the
evaluation process. Provide a synopsis of the scope of work, point of
contact and telephone number foreach project listed in SF 255 Block 8.
Firms having a current SF 254 on file with this office and those
responding by 4:00 p.m. EST, 29 March 1995 will be considered. Late
responses will be handled in accordance with FAR 52.215-10. Neither
handcarried proposals nor facsimile responses will be accepted. Firms
responding to this advertisement are requested to submit only one copy
of qualification statements. The qualification statements should
clearly indicate the office location where thework will be performed
and the qualifications of the individuals anticipated to work on the
contract and their geographical location.--This proposed contract is
being solicited on an unrestricted basis, therefore, replies to this
notice are requestedfrom all business concerns. Before award of
contract, the Architect-Engineer (if not a Small Business concern)
shall agree in the contract, by incorporation of an acceptable small
business and small disadvantaged business subcontracting plan
inaccordance with FAR Part 19.7, that small business concerns and small
disadvantaged business concerns shall have the maximum practicable
opportunity to participate in contract performance consistent with its
efficient performance.--The small businesssize standard classification
is SIC 8711 ($2,500,000).--This is not a request for proposals.
Inquiries concerning this project should mention location and contract
number. See Note 24.(0053) Loren Data Corp. http://www.ld.com (SYN# 0012 19950223\C-0001.SOL)