|
COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 27,1995 PSA#1291Kotaro Hashimoto, Director-General, Kinki Regional Construction Bureau
(Moc), 1-5-44 Otemae, Chuo-Ku, Osaka-Shi 540 99 -- JAPAN: SOL KENSETSU KOGYO SHIMBUN: 02/20/95 PG. 9. DUE 113095
POC Tel 81/6/942-1141 S1622 Construction of viaduct opening time and
date 11:30, mar. 28, 1995. Open 1) Construction Title Construction of
the substructure for the West Section of the muroyama viaduct on the
kobe- nishi bypass; 2) site muroyama-chisaki, myodani-cho, tarumi-Ku,
kobe-Shi, hyogo-ken; 3) summary total site length 214 meters;
substructure for the viaduct open caisson foundation, one set, 17 5
meters length; wall- type pier, one set, with pile foundation;
foundation for steel pier, one set, with pile foundation; inverted
''T''- type abutment, one set, with pile foundation; area of excavation
143 square meters; retaining Walls inverted ''T''-type retaining Walls
30 meters with pile foundation; box-type retaining Walls 66 meters
with pile foundation; 4) Construction period approx. 12 months; 5) main
materials to be used 9,590 cubic meters of concrete, 640 tons of
reinforcing steel; 6) deadline for submission of application
forms/related documents for qualification screening 16:30, feb. 27,
1995; 7) contact for Tender documents contract Division, General
Affairs department, Kinki Regional Construction Bureau, ministry of
Construction, 1-5-44 Otemae, Chuo-Ku, Osaka-Shi 540 eligible Tender
participants 1) firms that do not fall under articles 70 and 71 of the
cabinet order concerning budget, auditing, and accounting; 2) firms
qualified for open competitive tendering on Public works by the Kinki
Regional Construction Bureau; 3) firms that score 1,000 points or more
in a formula calculated from bidding company's objective criteria at
the time of application for qualification; 4) firms not undergoing
bankruptcy procedures; 5) firms that have -- since 1989 as the main
contractor -- actually constructed for a structural foundation an open
caisson of at least 10 meters length, excluding temporary Walls, and
110 square meters excavation area note: only Construction projects in
which bidder has had a 30 percent or greater share are eligible for
consideration; 6) firms that can assign to the Construction site a
full-time chief engineer or engineering supervisor who meets the
following criteria a) is qualified as a certified first-class
Construction supervisor or equivalent or higher; B) has -- since 1984
as the main contractor -- had experience with Construction of a similar
Project; and C) in the case of engineering supervisor, is qualified to
supervise designated Construction works; 7) firms not currently
suspended from designation by the Director of the Kinki Regional
Construction Bureau; and 8) firms not related by capital or personnel
to the contractors involved in this Project bid documents must be
obtained directly from the submitting agency, not from U S. Embassy.
Date of publication in ''kensetsu kogyo shimbun'' 022095. Post
contact/prepared by gtaevs Please send a copy of your response to:
Commercial Section (FCS TOP), American Embassy, Tokyo, Unit 45004, APO
Ap 96337, Refer to TC0310.. (0054) Loren Data Corp. http://www.ld.com (SYN# 0392 19950224\99-0003.SOL)
99 - Miscellaneous Index Page
|
|