COMMERCE BUSINESS DAILY ISSUE OF FEBRUARY 27,1995 PSA#1291Kotaro Hashimoto, Director-General, Kinki Regional Construction Bureau
(Moc), 1-5-44 Otemae, Chuo-Ku, Osaka-Shi 540 99 -- JAPAN: SOL KENSETSU KOGYO SHIMBUN: 02/20/95 PG. 9. DUE 103095
POC Tel 81/6/942-1141 S1622 Construction of viaduct opening time and
date 10:30, mar. 28, 1995. Open 1) Construction Title Construction of
the superstructure for the muroyama viaduct outside of the kobe-nishi
bypass tarumi junction; 2) site muroyama- chisaki, myodani-cho,
tarumi-Ku, kobe-Shi, hyogo-ken; 3) summary total site length 188.4
meters; standard width 9 75 meters for both directions of traffic;
types of bridges 2-span continuous, steel-plate surface, box- girder
bridge 159 meters with span lengths of 71 7 and 87 7 meters; 2-span
continuous, steel-plate surface, box- girder bridge 130 4 meters with
span lengths of 71.7 and 58 7 meters; 2-span continuous, unfabricated
steel girder bridge 58 0 meters with span lengths of 29.0 and 29.0
meters; simple, unfabricated steel girder bridge 29 0 meters; 4)
Construction period approx. 24 months; 5) main materials to be used
1,760 tons of steel; 6) documents for qualification screening 16:30,
feb. 27, 1995; 7) contact for Tender documents contract Division,
General Affairs department, Kinki Regional Construction Bureau,
ministry of Construction, 1-5-44 Otemae, Chuo-Ku, Osaka-Shi 540
eligible Tender participants 1) firms that do not fall under articles
70 and 71 of the cabinet order concerning budget, auditing, and
accounting; 2) firms qualified for open competitive tendering on
Construction of superstructure for steel bridge by the Kinki Regional
Construction Bureau; 3) firms not undergoing bankruptcy procedures; 4)
firms that have -- since 1989 as the main contractor -- actually
manufactured a multi-continuous, steel-plate surface, box-girder bridge
of at least 70 meters maximum span length and constructed the
superstructure for the steel bridge on a currently-used main Road of at
least four lanes note: only Construction projects in which bidder has
had a 30 percent or greater share are eligible for consideration; 5)
firms that can as8IGN to the Construction site during the on-site
Construction period a full-time chief engineer or engineering
supervisor who meets the following criteria a) is qualified as a
certified first-class Construction supervisor or equivalent or higher;
B) has -- since 1984 as the main contractor -- had experience with
on-site Construction of a similar Project; C) in the case of
engineering supervisor, is qualified to supervise designated
Construction works; 6) firms not currently suspended from designation
by the Director of the Kinki Regional Construction Bureau; and 7) firms
not related by capital or personnel to the contractors involved in this
Project bid documents must be obtained directly from the submitting
agency, not from U S. Embassy. Date of publication in '' kensetsu kogyo
shimbun'' 022095. Post contact/prepared by gtaevs Please send a copy of
your response to: Commercial Section (FCS TOP), American Embassy,
Tokyo, Unit 45004, APO Ap 96337, Refer to TC0309.. (0054) Loren Data Corp. http://www.ld.com (SYN# 0393 19950224\99-0004.SOL)